IAC Top Ten

Generate a list of top recommendations

ARC: SIC: NAICS: YEAR:
STATE: Center:
Show Top: SORT BY:
Minimum # Recommended

# ARC Description Times
Rec'd
Average
Savings
Average
Cost
Average
Payback
Imp
Rate
1 2.7122 DISCONNECT BALLASTS 13 $5,424 $999 0.6 100.00%
2 2.2113 REPAIR OR REPLACE STEAM TRAPS 35 $63,922 $6,107 0.5 100.00%
3 2.2135 REPAIR AND ELIMINATE STEAM LEAKS 12 $12,831 $870 0.4 100.00%
4 3.5245 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY 5 $8,635 $280 0.2 100.00%
5 3.4155 METER WASTE WATER 5 $29,959 $789 0.1 100.00%
6 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY 52 $11,438 $708 0.1 98.08%
7 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES 218 $3,200 $527 0.3 95.61%
8 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM 111 $7,793 $1,491 0.5 93.94%
9 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM 13 $9,634 $1,279 0.2 90.91%
10 2.4151 DEVELOP A REPAIR/REPLACE POLICY 160 $5,881 $1,033 0.4 89.51%