1 3.7392 APPLY A PROTECTIVE COATING TO RACKS AND TANKS 5 $2,660 $24 0.0 100.00%
2 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM 103 $8,568 $1,487 0.4 95.79%
3 3.1227 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) 7 $6,859 $13,203 3.5 85.71%
4 2.6125 KEEP EQUIPMENT CLEAN 28 $18,932 $11,920 0.4 83.33%
5 2.2135 REPAIR AND ELIMINATE STEAM LEAKS 295 $102,709 $8,696 0.4 82.01%
6 2.2133 REPAIR LEAKS IN LINES AND VALVES 417 $11,702 $1,924 0.3 81.82%
7 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES 7,039 $5,941 $1,421 0.4 81.77%
8 2.2113 REPAIR OR REPLACE STEAM TRAPS 283 $38,849 $7,461 0.4 77.90%
9 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS 38 $10,950 $2,809 0.3 77.14%
10 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES 154 $5,375 $4,103 1.8 76.03%