UM0409 USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER $7,590 $10,000 1.3
UM0409 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,058 $1,200 1.1
UM0409 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR $2,652 $6,000 2.3
UM0409 INSULATE BARE EQUIPMENT $4,324 $3,000 0.7
UM0409 INSULATE STEAM / HOT WATER LINES $7,300 $5,000 0.7
DL0022 INSULATE STEAM / HOT WATER LINES $1,858 $1,000 0.5 I
DL0022 OPERATE BOILERS ON HIGH FIRE SETTING $10,038 $0 0.0 I
DL0022 MINIMIZE WATER USAGE $18,580 $10,000 0.5 I
DL0022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,452 $38,199 3.1 I
DL0022 REPLACE BOILER $39,920 $112,000 2.8 N
DL0022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,579 $0 0.0 N
OR0480 OPTIMIZE PLANT POWER FACTOR $1,910 $2,000 1.0 N
OR0480 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $3,200 1.0 I
OR0480 METER WASTE WATER $14,400 $0 0.0 I
OR0480 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $493 $0 0.0 I