SEARCH: Recommendations


1,775 Recommendations Found

RESET

Year
ARC Code
SIC Code
NAICS Code
Savings
Imp Cost
Select State
Imp Status
Filter by Center
Per Page
ID Description Savings Cost Payback Status
(1-25) Next 25 >
WV0450 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 0.1 I
WV0450 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 2.0 I
WV0450 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 0.6 I
WV0450 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR $130,899 $157,320 1.2 I
WV0450 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 0.0 I
LE0336 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,762 $25 0.0 I
LE0336 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,616 $650 0.2 I
LE0336 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,840 $3,000 1.1 I
LE0336 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,242 $16,000 2.6 I
LE0336 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET $7,734 $8,000 1.0 I
LE0336 INSTALL TIMERS AND/OR THERMOSTATS $18,760 $150 0.0 I
LE0336 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,173 $1,000 0.1 I
LE0332 DEVELOP STANDARD OPERATING PROCEDURES $6,689 $0 0.0 I
LE0332 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,829 $40 0.0 I
WV0441 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING $1,137 $1,063 0.9 I
WV0441 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,782 $0 0.0 I
WV0441 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,022 $9,275 0.9 I
WV0441 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,024 $37,887 2.9 I
WV0441 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $49,557 $11,000 0.2 I
WV0441 DEVELOP A REPAIR/REPLACE POLICY $38,793 $10,750 0.3 I
WV0441 USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS $64,675 $91,200 1.4 I
WV0441 UPGRADE CONTROLS ON COMPRESSORS $73,647 $33,378 0.5 I
LE0331 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 0.3 I
LE0331 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,134 $2,500 0.8 I
LE0331 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $24,579 $0 0.0 I
(1-25) Next 25 >