| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| NC0459 |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING |
$313 |
$750 |
2.4 |
I |
| NC0459 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$2,985 |
$600 |
0.2 |
I |
| NC0459 |
INSTALL OCCUPANCY SENSORS |
$222 |
$300 |
1.4 |
I |
| NC0459 |
USE MORE EFFICIENT LIGHT SOURCE |
$9,925 |
$8,552 |
0.9 |
I |
| NC0459 |
USE MORE EFFICIENT LIGHT SOURCE |
$25,477 |
$67,898 |
2.7 |
I |
| NC0459 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$44,453 |
$152,640 |
3.4 |
I |
| NC0460 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$8,756 |
$500 |
0.1 |
I |
| NC0460 |
REPAIR LEAKS IN LINES AND VALVES |
$3,142 |
$2,100 |
0.7 |
I |
| NC0457 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$508 |
$400 |
0.8 |
I |
| NC0457 |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING |
$3,516 |
$0 |
0.0 |
I |
| NC0457 |
USE MORE EFFICIENT LIGHT SOURCE |
$1,926 |
$7,711 |
4.0 |
I |
| NC0457 |
INSTALL OCCUPANCY SENSORS |
$415 |
$525 |
1.3 |
I |
| NC0458 |
USE PHOTOCELL CONTROLS |
$169 |
$250 |
1.5 |
I |
| NC0458 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$3,659 |
$441 |
0.1 |
I |
| NC0458 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$5,851 |
$26,563 |
4.5 |
I |
| NC0458 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$453 |
$100 |
0.2 |
I |
| NC0458 |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
$211,680 |
$48,800 |
0.2 |
I |
| NC0456 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$997 |
$100 |
0.1 |
I |
| NC0456 |
REPAIR OR REPLACE STEAM TRAPS |
$34,238 |
$5,500 |
0.2 |
I |
| NC0455 |
USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
$113,133 |
$50,000 |
0.4 |
I |
| NC0455 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$1,649 |
$100 |
0.1 |
I |
| NC0455 |
INSULATE BARE EQUIPMENT |
$17,379 |
$2,419 |
0.1 |
I |
| NC0450 |
MAINTAIN CLEAN CONDITIONS BEFORE PAINTING |
$38,389 |
$30,000 |
0.8 |
I |
| NC0450 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
$105,000 |
$40,000 |
0.4 |
I |
| NC0450 |
ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
$113,534 |
$25,000 |
0.2 |
I |
|
|