| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| DL0102 |
INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
$320 |
$185 |
0.6 |
|
| DL0101 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$5,800 |
$0 |
0.0 |
|
| DL0101 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$5,700 |
$19,110 |
3.4 |
|
| DL0101 |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE |
$7,100 |
$22,500 |
3.2 |
|
| DL0101 |
INSULATE STEAM / HOT WATER LINES |
$1,900 |
$3,500 |
1.8 |
|
| DL0101 |
REPLACE BOILER |
$16,867 |
$28,062 |
1.7 |
|
| DL0101 |
RECOVER HEAT FROM OVEN EXHAUST / KILNS |
$51,000 |
$130,000 |
2.5 |
|
| DL0101 |
USE OPTIMUM THICKNESS INSULATION |
$7,200 |
$432 |
0.1 |
|
| DL0101 |
CLOSE OFF UNNEEDED STEAM LINES |
$5,097 |
$225 |
0.0 |
|
| DL0100 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$5,567 |
$100 |
0.0 |
|
| DL0100 |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
$7,275 |
$0 |
0.0 |
|
| DL0100 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$1,698 |
$3,500 |
2.1 |
|
| DL0100 |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE |
$1,094 |
$2,000 |
1.8 |
|
| DL0100 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$10,271 |
$49,280 |
4.8 |
|
| DL0100 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$1,455 |
$20,000 |
13.7 |
|
| DL0100 |
TREAT AND REUSE RINSE WATERS |
$7,121 |
$10,000 |
1.4 |
|
| DL0098 |
MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT |
$700 |
$500 |
0.7 |
|
| DL0098 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$3,060 |
$4,880 |
1.6 |
|
| DL0098 |
KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
$10,500 |
$19,500 |
1.9 |
|
| DL0098 |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS |
$2,100 |
$18,000 |
8.6 |
|
| DL0098 |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS |
$2,900 |
$18,000 |
6.2 |
|
| DL0098 |
REDUCE WATER USE WITH COUNTER CURRENT RINSING |
$92,987 |
$22,000 |
0.2 |
|
| DL0094 |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
$570 |
$10 |
0.0 |
|
| DL0094 |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
$384 |
$0 |
0.0 |
|
| DL0094 |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
$2,392 |
$7,320 |
3.1 |
|
|
|