| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| SD0449 |
REPAIR LEAKS IN LINES AND VALVES |
$4,456 |
$1,200 |
0.3 |
I |
| SD0449 |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
$865 |
$1,500 |
1.7 |
I |
| SD0449 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$4,392 |
$100 |
0.0 |
I |
| SF0413 |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE |
$40,499 |
$409,247 |
10.1 |
I |
| SF0413 |
INSULATE STEAM / HOT WATER LINES |
$936 |
$380 |
0.4 |
I |
| SD0445 |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
$351,013 |
$1,040,000 |
3.0 |
I |
| SD0445 |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
$84,757 |
$300,000 |
3.5 |
I |
| SD0445 |
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
$11,844 |
$39,150 |
3.3 |
I |
| SD0445 |
SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
$33,123 |
$1,878 |
0.1 |
I |
| SD0446 |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS |
$15,478 |
$15,745 |
1.0 |
I |
| SD0446 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$3,854 |
$500 |
0.1 |
I |
| SD0446 |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR |
$11,000 |
$4,045 |
0.4 |
I |
| SD0446 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$629 |
$100 |
0.2 |
I |
| SD0444 |
INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
$740 |
$653 |
0.9 |
I |
| SD0444 |
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
$1,113 |
$272 |
0.2 |
I |
| SD0444 |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
$1,992 |
$100 |
0.1 |
I |
| SF0411 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$33,986 |
$135,330 |
4.0 |
I |
| SF0411 |
INSTALL OCCUPANCY SENSORS |
$18,497 |
$47,901 |
2.6 |
I |
| SF0411 |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
$1,094 |
$939 |
0.9 |
I |
| SF0411 |
COMBINE UTILITY METERS |
$35,266 |
$0 |
0.0 |
I |
| SF0411 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$3,097 |
$504 |
0.2 |
I |
| SF0411 |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
$1,666 |
$1,200 |
0.7 |
I |
| SF0411 |
SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY |
$716 |
$0 |
0.0 |
I |
| SF0408 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$2,111 |
$0 |
0.0 |
I |
| SF0408 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$1,571 |
$80 |
0.1 |
I |
|
|