| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| OK0825 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$12,478 |
$1,500 |
0.1 |
I |
| OK0825 |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
$1,119 |
$538 |
0.5 |
I |
| OK0825 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$7,541 |
$68,775 |
9.1 |
I |
| TT0090 |
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
$1,275 |
$1,000 |
0.8 |
I |
| TT0090 |
USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
$2,764 |
$2,000 |
0.7 |
I |
| TT0090 |
INSTALL OCCUPANCY SENSORS |
$1,008 |
$1,780 |
1.8 |
I |
| TT0090 |
USE MORE EFFICIENT LIGHT SOURCE |
$134 |
$525 |
3.9 |
I |
| TT0090 |
DEVELOP A REPAIR/REPLACE POLICY |
$2,350 |
$2,400 |
1.0 |
I |
| TT0090 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$334 |
$0 |
0.0 |
I |
| OK0820 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$16,500 |
$16,200 |
1.0 |
I |
| MZ0064 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$1,612 |
$0 |
0.0 |
I |
| MZ0064 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$4,258 |
$1,800 |
0.4 |
I |
| MZ0064 |
INSTALL OCCUPANCY SENSORS |
$1,520 |
$8,600 |
5.7 |
I |
| MZ0064 |
USE MORE EFFICIENT LIGHT SOURCE |
$6,083 |
$6,900 |
1.1 |
I |
| MZ0064 |
USE MORE EFFICIENT LIGHT SOURCE |
$58,225 |
$57,800 |
1.0 |
I |
| MZ0064 |
INSTALL OCCUPANCY SENSORS |
$12,142 |
$3,680 |
0.3 |
I |
| OK0810 |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
$5,317 |
$0 |
0.0 |
I |
| OK0810 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$44,840 |
$11,400 |
0.3 |
I |
| OK0808 |
USE POWER DURING OFF-PEAK PERIODS |
$19,801 |
$226 |
0.0 |
I |
| OK0808 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$8,547 |
$17,879 |
2.1 |
I |
| OK0808 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$1,907 |
$5,105 |
2.7 |
I |
| OK0808 |
INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
$27,934 |
$5,125 |
0.2 |
I |
| OK0805 |
IMPROVE COMBUSTION CONTROL CAPABILITY |
$165,120 |
$3,385 |
0.0 |
I |
| OK0805 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$98,548 |
$15,600 |
0.2 |
I |
| TT0063 |
RECOVER HEAT FROM HOT WASTE WATER |
$900 |
$1,050 |
1.2 |
I |
|
|