U.S. Department of Energy - Energy Efficiency and Renewable Energy

Industrial Technologies Program

SEARCH: Recommendations


14 Recommendations Found

RESET

Year
ARC Code
SIC Code
NAICS Code
Savings
Imp Cost
Select State
Imp Status
Filter by Center
Per Page
ID Description Savings Cost Payback Status
(1-14)
UL0126 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,745 $2,000 0.1 I
UL0126 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,272 $40 0.0 N
UL0126 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $40 0.0 I
UL0126 OPTIMIZE PLANT POWER FACTOR $24,600 $16,488 0.7 N
TN0501 INSTALL TIMERS AND/OR THERMOSTATS $15,769 $6,930 0.4 I
TN0501 INSTALL SPECTRAL REFLECTORS / DELAMP $17,524 $43,092 2.5 I
TN0501 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,522 $580 0.4 I
TN0501 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,822 $2,457 1.3 I
TN0501 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $382 $170 0.4 I
TN0501 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $283 $0 0.0 N
UD0356 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,491 $0 0.0 N
UD0356 USE MORE EFFICIENT LIGHT SOURCE $3,964 $0 0.0 N
UD0356 KEEP LAMPS AND REFLECTORS CLEAN $4,191 $0 0.0 N
UD0356 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,390 $0 0.0 N
(1-14)