SEARCH: Recommendations


32 Recommendations Found

RESET

Year
ARC Code
SIC Code
NAICS Code
Savings
Imp Cost
Select State
Imp Status
Filter by Center
Per Page
ID Description Savings Cost Payback Status
(1-25) Next 7 >
LE0234 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $190,924 $500,000 2.6 I
LE0234 REPAIR OR REPLACE STEAM TRAPS $46,545 $3,000 0.1 I
LE0234 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,090 $6,000 0.6 I
LE0234 INSTALL OCCUPANCY SENSORS $5,320 $1,500 0.3 I
LE0234 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $3,490 1.1 I
LE0234 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $593 $60 0.1 I
LE0210 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 0.3 I
LE0210 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 2.1 I
LE0210 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 0.2 I
LE0210 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 0.8 I
LE0198 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $566 1.0 I
LE0198 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $2,500 1.0 I
LE0198 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,443 $24,000 9.8 I
LE0156 INSTALL OCCUPANCY SENSORS $239 $600 2.5 I
LE0156 INSULATE BARE EQUIPMENT $1,413 $0 0.0 I
LE0156 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,340 $0 0.0 I
LE0156 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $1,112 $870 0.8 I
HO0178 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,429 $30,000 2.6 I
HO0178 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,500 $360 0.1 I
HO0178 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,000 $2,000 0.1 I
HO0178 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $828 $0 0.0 I
HO0178 INSULATE BARE EQUIPMENT $282 $200 0.7 I
HO0178 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,272 $1,000 0.4 I
HO0178 INSTALL OCCUPANCY SENSORS $244 $200 0.8 I
HO0178 USE MORE EFFICIENT LIGHT SOURCE $3,308 $4,853 1.5 I
(1-25) Next 7 >