UD0712 ELIMINATE SHIFT $2,256 $0 0.0 N
UD0677 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,103 $28,000 0.8 N
MS0178 INSTALL EQUIPMENT TO MOVE PRODUCT $122,949 $105,000 0.9 I
MS0178 EXPAND OPERATIONS INTO UNUSED SPACE $583,296 $1,050,000 1.8 N
MO0257 UTILIZE OUTSIDE CONTRACTING $11,880 $0 0.0 N
MO0257 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,004 $0 0.0 I
IA0214 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $176,000 $575,000 3.3 N
TN0643 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $219,500 $24,000 0.1 I
TN0643 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $90,000 $30,000 0.3 N
IA0196 INSTALL AUTOMATIC PACKING EQUIPMENT $75,000 $66,000 0.9 N
IA0196 AUTOMATE FINISHING PROCESS $242,896 $180,000 0.7 N
IA0196 AUTOMATE FINISHING PROCESS $68,064 $11,000 0.2 N
IA0196 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $83,349 $0 0.0 I
IA0196 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $30,000 1.0 N
IA0196 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $30,000 $900 0.0 I
AS0218 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,609,654 $4,960 0.0 N
TN0617 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $24,900 $21,000 0.8 K
OK0524 ELIMINATE SHIFT $86,855 $175,000 2.0 N
ME0213 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $1,800 $1,500 0.8 I