ID Description Savings Cost Payback Status
(1-7)
OK0653 AUTOMATE FINISHING PROCESS $36,680 $73,250 2.0 N
OK0653 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,432 $4,800 0.2 N
OK0653 INSTALL SET-BACK TIMERS $5,337 $3,280 0.6 N
OK0653 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,904 $13,860 3.6 N
OK0653 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,582 $600 0.1 N
OK0653 INCREASE INSULATION THICKNESS $14,697 $8,210 0.6 I
OK0653 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,530 $6,844 0.6 N