ID Description Savings Cost Payback Status
(1-13)
UF0396 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $7,488 $970 0.1 N
MI0091 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $2,500 $120 0.0 N
MI0049 SCHEDULE DELIVERIES ACCORDING TO DEMAND $259,200 $75,000 0.3 P
MI0049 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $1,206,000 $100 0.0 I
AS0315 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $81 $306 3.8 N
IA0261 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $22,750 $50,000 2.2 N
SD0235 SCHEDULE DELIVERIES ACCORDING TO DEMAND $7,690 $0 0.0 N
SD0231 SCHEDULE DELIVERIES ACCORDING TO DEMAND $7,020 $0 0.0 I
SD0219 SCHEDULE DELIVERIES ACCORDING TO DEMAND $7,020 $0 0.0 I
TN0655 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $112,500 $60,000 0.5 N
CO0398 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $41,400 $250,000 6.0 N
TN0613 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $35,000 $22,200 0.6 N
UF0128 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $5,730 $7,000 1.2 N