| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| UD0759 |
RECOVER WASTE HEAT FROM EQUIPMENT |
$11,130 |
$0 |
0.0 |
I |
| UD0759 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$7,675 |
$0 |
0.0 |
I |
| UD0759 |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
$3,276 |
$0 |
0.0 |
I |
| UD0759 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$664 |
$500 |
0.8 |
I |
| UD0759 |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
$1,440 |
$0 |
0.0 |
I |
| UD0654 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$415 |
$200 |
0.5 |
I |
| UD0654 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$1,212 |
$0 |
0.0 |
I |
| WV0232 |
USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
$2,127 |
$1,155 |
0.5 |
I |
| WV0232 |
LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
$11,788 |
$0 |
0.0 |
I |
| WV0232 |
CONTRACT A WOOD PALLET RECYCLING COMPANY |
$4,680 |
$100 |
0.0 |
I |
| WV0232 |
REUSE / RECYCLE/ SELL PAPER PRODUCTS |
$16,400 |
$60 |
0.0 |
I |
| WV0232 |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
$907 |
$480 |
0.5 |
I |
| WV0232 |
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
$1,421 |
$0 |
0.0 |
I |
| WV0232 |
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
$2,818 |
$300 |
0.1 |
I |
| WV0232 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$884 |
$150 |
0.2 |
I |
| WV0232 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$689 |
$20 |
0.0 |
I |
| UD0551 |
REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
$1,083 |
$225 |
0.2 |
I |
| UD0551 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$7,897 |
$10,073 |
1.3 |
I |
| UD0535 |
CONTRACT A WOOD PALLET RECYCLING COMPANY |
$1,810 |
$0 |
0.0 |
I |
| UD0535 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$9,064 |
$43,075 |
4.8 |
I |
| UD0442 |
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
$12,118 |
$1,000 |
0.1 |
I |
| UD0442 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$1,952 |
$6,200 |
3.2 |
I |
| UD0442 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$1,818 |
$3,360 |
1.8 |
I |
| UD0442 |
RECOVER HEAT FROM AIR COMPRESSOR |
$8,910 |
$10,000 |
1.1 |
I |
| UD0442 |
IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) |
$3,914 |
$0 |
0.0 |
I |
|
|