| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| TT0108 |
CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS |
$5,367 |
$8,075 |
1.5 |
|
| UA0094 |
OPTIMIZE PLANT POWER FACTOR |
$6,000 |
$14,980 |
2.5 |
|
| UMS012 |
USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
$553,000 |
$750,000 |
1.4 |
|
| DL0054 |
RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
$15,225 |
$50 |
0.0 |
N |
| NC0403 |
BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
$1,310,487 |
$0 |
0.0 |
N |
| WV0393 |
USE DEMAND CONTROLLER OR LOAD SHEDDER |
$4,441 |
$7,800 |
1.8 |
N |
| TT0030 |
USE POWER FACTOR CONTROLLERS |
$4,100 |
$22,600 |
5.5 |
N |
| TT0028 |
BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
$993,250 |
$4,000,000 |
4.0 |
N |
| TT0028 |
USE POWER FACTOR CONTROLLERS |
$5,033 |
$23,900 |
4.7 |
N |
| LE0266 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$1,436 |
$2,500 |
1.7 |
N |
| NC0368 |
BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
$42,586 |
$100,000 |
2.3 |
N |
| NC0367 |
USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
$9,176 |
$30,000 |
3.3 |
N |
| NC0367 |
BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
$43,971 |
$100,000 |
2.3 |
N |
| MS0320 |
BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
$49,454 |
$130,000 |
2.6 |
N |
| OK0747 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$7,099 |
$0 |
0.0 |
N |
| AM0528 |
OPTIMIZE PLANT POWER FACTOR |
$9,100 |
$5,920 |
0.7 |
I |
| MA0615 |
OPTIMIZE PLANT POWER FACTOR |
$4,673 |
$18,500 |
4.0 |
I |
| LE0248 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$3,500 |
$2,500 |
0.7 |
I |
| MS0305 |
USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
$48,733 |
$70,000 |
1.4 |
N |
| NC0324 |
MAKE ICE DURING OFF PEAK HOURS FOR COOLING |
$1,571 |
$5,425 |
3.5 |
N |
| BD0287 |
RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
$146 |
$0 |
0.0 |
I |
| BD0285 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$488 |
$0 |
0.0 |
I |
| LE0202 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$1,378 |
$2,500 |
1.8 |
I |
| OK0696 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$6,344 |
$2,100 |
0.3 |
N |
| OK0683 |
USE POWER FACTOR CONTROLLERS |
$8,063 |
$7,713 |
1.0 |
I |
|
|