| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| UU0084 |
COMBINE UTILITY METERS |
$575 |
$315 |
0.5 |
N |
| UU0084 |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
$1,643 |
$6,171 |
3.8 |
N |
| UU0084 |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
$697 |
$2,150 |
3.1 |
N |
| UU0084 |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING |
$1,537 |
$0 |
0.0 |
N |
| UU0084 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$506 |
$235 |
0.5 |
N |
| UU0084 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$491 |
$200 |
0.4 |
N |
| UU0084 |
OPTIMIZE PLANT POWER FACTOR |
$4,429 |
$5,220 |
1.2 |
N |
| UU0073 |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
$8,250 |
$8,000 |
1.0 |
N |
| UU0073 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$1,080 |
$860 |
0.8 |
N |
| UU0073 |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
$990 |
$6,000 |
6.1 |
N |
| UU0073 |
REUSE / RECYCLE/ SELL PAPER PRODUCTS |
$2,434 |
$0 |
0.0 |
N |
| UU0073 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
$10,500 |
$15,000 |
1.4 |
N |
| UU0073 |
USE DEMAND CONTROLLER OR LOAD SHEDDER |
$2,700 |
$2,500 |
0.9 |
N |
| UU0073 |
DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
$130 |
$0 |
0.0 |
N |
| UU0070 |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
$95,199 |
$0 |
0.0 |
I |
| UU0070 |
OPTIMIZE PLANT POWER FACTOR |
$16,729 |
$26,520 |
1.6 |
N |
| UU0070 |
RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
$73,401 |
$750,000 |
10.2 |
I |
| UU0070 |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
$70,000 |
$18,000 |
0.3 |
I |
| UU0070 |
USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
$1,370,474 |
$22,000,000 |
16.1 |
N |
| UU0065 |
INSTALL SPECTRAL REFLECTORS / DELAMP |
$1,188 |
$225 |
0.2 |
I |
| UU0065 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$1,345 |
$1,100 |
0.8 |
I |
| UU0065 |
OPTIMIZE PLANT POWER FACTOR |
$4,060 |
$5,520 |
1.4 |
N |
| UU0065 |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
$6,450 |
$0 |
0.0 |
I |
| UU0065 |
INSULATE STEAM / HOT WATER LINES |
$1,650 |
$675 |
0.4 |
N |
|
|