| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| OR0517 |
INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION |
$18,000 |
$0 |
0.0 |
I |
| LL0275 |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
$2,372 |
$240 |
0.1 |
I |
| LE0241 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
$24,673 |
$12,500 |
0.5 |
N |
| LM0111 |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
$650,132 |
$0 |
0.0 |
I |
| LM0111 |
ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
$235,359 |
$7,000 |
0.0 |
N |
| CO0580 |
INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
$479,740 |
$28,080 |
0.1 |
N |
| UF0368 |
USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
$6,656 |
$5,000 |
0.8 |
I |
| MI0110 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
$49,464 |
$16,000 |
0.3 |
N |
| UD0709 |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
$13,847 |
$40,000 |
2.9 |
N |
| OK0690 |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
$2,000 |
$0 |
0.0 |
I |
| SF0271 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
$8,073 |
$20,578 |
2.5 |
N |
| UM0237 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
$116,280 |
$1,500 |
0.0 |
N |
| SD0320 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
$31,334 |
$6,000 |
0.2 |
I |
| LM0048 |
DEVELOP STANDARD OPERATING PROCEDURES |
$36,400 |
$14,567 |
0.4 |
I |
| LM0048 |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
$105,000 |
$40,872 |
0.4 |
N |
| LM0048 |
PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST |
$1,700 |
$2,300 |
1.4 |
N |
| LM0048 |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
$82,232 |
$25,000 |
0.3 |
I |
| LM0048 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
$672,000 |
$100,000 |
0.1 |
I |
| LM0048 |
DEVELOP STANDARD OPERATING PROCEDURES |
$25,093 |
$15,842 |
0.6 |
I |
| UF0313 |
INSTALL BACK-UP EQUIPMENT |
$57,960 |
$109,500 |
1.9 |
I |
| UF0313 |
INSTALL SYSTEM TO COLLECT SCRAP |
$1,808 |
$700 |
0.4 |
I |
| AM0423 |
CHANGE OPERATING CONDITIONS |
$133,100 |
$249,000 |
1.9 |
N |
| AM0423 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
$27,800 |
$18,880 |
0.7 |
I |
| AM0423 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
$18,500 |
$15,780 |
0.9 |
I |
| AM0423 |
ADOPT IN-HOUSE MATERIAL GENERATION |
$14,400 |
$0 |
0.0 |
N |
|
|