| ID |
Description |
Savings |
Cost |
Payback |
Status |
|
|
| OK0836 |
UPGRADE CONTROLS ON COMPRESSORS |
$28,900 |
$15,100 |
0.5 |
|
| OK0836 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$2,400 |
$10,000 |
4.2 |
|
| OK0836 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$11,200 |
$27,500 |
2.5 |
|
| MA0702 |
REDUCE FLUID FLOW RATES |
$11,375 |
$9,400 |
0.8 |
I |
| MA0702 |
USE MORE EFFICIENT LIGHT SOURCE |
$868 |
$3,000 |
3.5 |
I |
| MA0702 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$2,144 |
$1,500 |
0.7 |
I |
| MA0702 |
INSULATE STEAM / HOT WATER LINES |
$1,102 |
$2,210 |
2.0 |
N |
| UM0414 |
REDUCE VENTILATION AIR |
$9,526 |
$0 |
0.0 |
|
| UM0414 |
REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT |
$11,148 |
$7,000 |
0.6 |
|
| UM0414 |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
$449 |
$100 |
0.2 |
|
| UM0414 |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
$1,787 |
$200 |
0.1 |
|
| UM0414 |
RECOVER WASTE HEAT FROM EQUIPMENT |
$3,440 |
$10,000 |
2.9 |
|
| UM0414 |
REDUCE VENTILATION AIR |
$15,347 |
$20,200 |
1.3 |
|
| UM0414 |
OPTIMIZE PLANT POWER FACTOR |
$6,520 |
$10,000 |
1.5 |
|
| CO0666 |
OPTIMIZE PLANT POWER FACTOR |
$30,160 |
$56,610 |
1.9 |
|
| CO0666 |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING |
$3,090 |
$430 |
0.1 |
|
| CO0666 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$5,710 |
$1,920 |
0.3 |
|
| CO0666 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$9,730 |
$13,270 |
1.4 |
|
| CO0666 |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
$14,630 |
$32,970 |
2.3 |
|
| CO0666 |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET |
$25,240 |
$155,860 |
6.2 |
|
| SF0421 |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
$6,912 |
$0 |
0.0 |
|
| SF0421 |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
$3,017 |
$0 |
0.0 |
|
| BS0005 |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
$6,970 |
$609 |
0.1 |
I |
| SF0421 |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
$24,965 |
$104,550 |
4.2 |
|
| BS0005 |
TURN OFF EQUIPMENT WHEN NOT IN USE |
$2,733 |
$178 |
0.1 |
I |
|
|