SEARCH: Recommendations


5,859 Recommendations Found

RESET

Year
ARC Code
SIC Code
NAICS Code
Savings
Imp Cost
Select State
Imp Status
Filter by Center
Per Page
ID Description Savings Cost Payback Status
(1-25) Next 25 >
WM0024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $827 $2,009 2.4
DL0104 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 2.4
SU0344 PAY BILLS ON TIME TO AVOID LATE FEES $599 $0 0.0
IP0013 APPLY FOR INVESTMENT INCENTIVES $4,197 $0 0.0
WV0468 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $20,196 $57,000 2.8
IP0011 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $131,250 $15,000 0.1
OR0602 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $199,441 $59,312 0.3
OR0602 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $17,131 $45,000 2.6
SD0468 MODIFY STARTUP/SHUTDOWN TIMES $7,607 $1,050 0.1
WM0023 IMPROVE SPACE COMFORT CONDITIONING $27,144 $5,800 0.2
WM0023 IMPROVE SPACE COMFORT CONDITIONING $50,218 $27,650 0.6
IP0010 APPLY FOR INVESTMENT INCENTIVES $4,545 $0 0.0
SU0338 MODIFY WORKLOAD $80,009 $2,213 0.0
SU0338 PAY BILLS ON TIME TO AVOID LATE FEES $3,233 $0 0.0
OR0601 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $51,858 $112,345 2.2
SU0334 PAY BILLS ON TIME TO AVOID LATE FEES $450 $0 0.0
NC0476 ELIMINATE SHIFT $688,031 $25,000 0.0
SU0329 PAY BILLS ON TIME TO AVOID LATE FEES $13,725 $0 0.0
BD0418 MOVE PRODUCT USING MECHANICAL MEANS $12,870 $20,000 1.6
SU0328 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,560 $54,280 4.0
WM0011 IMPROVE SPACE COMFORT CONDITIONING $2,993 $2,050 0.7
UA0089 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $124,000 $150,000 1.2
MZ0105 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1 $1 1.0
SU0327 PAY BILLS ON TIME TO AVOID LATE FEES $287 $0 0.0 N
OR0600 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $4,720 $0 0.0
(1-25) Next 25 >