761 Recommendations Found
RESET
|
| ID |
Description |
Savings |
Cost |
Payback |
Impstatus |
|
|
| MA0565 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $216,000 | $125,000 | 0.6 | I | | MA0565 | MODIFY PROCESS TO REDUCE MATERIAL COSTS | $57,540 | $40,000 | 0.7 | I | | MA0565 | REPLACE BOILER | $2,760 | $750 | 0.3 | I | | MA0565 | INSULATE BARE EQUIPMENT | $2,705 | $754 | 0.3 | I | | MA0565 | INSULATE FEEDWATER TANK | $873 | $300 | 0.3 | I | | MA0564 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $548 | 4.5 | I | | MA0563 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $116 | $0 | 0.0 | I | | MA0563 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,769 | $650 | 0.4 | I | | MA0563 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,550 | $12,000 | 0.3 | I | | MA0500 | OPTIMIZE PLANT POWER FACTOR | $14,725 | $35,000 | 2.4 | I | | MA0500 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,264 | $2,000 | 0.5 | I | | ME0305 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,013 | $340 | 0.2 | I | | ME0305 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $1,193 | 3.0 | I | | ME0305 | INSULATE STEAM / HOT WATER LINES | $366 | $357 | 1.0 | I | | ME0305 | MINIMIZE WATER USAGE | $325 | $225 | 0.7 | I | | ME0305 | AUTOMATE FINISHING PROCESS | $15,000 | $41,800 | 2.8 | I | | ME0304 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,848 | $0 | 0.0 | I | | ME0304 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,835 | $4,434 | 0.1 | I | | ME0298 | USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | $35,240 | $66,900 | 1.9 | I | | ME0298 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,392 | $340 | 0.2 | I | | ME0293 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,183 | $0 | 0.0 | I | | ME0293 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $200 | 0.8 | I | | ME0292 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,822 | $340 | 0.1 | I | | ME0292 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $310 | $240 | 0.8 | I | | ME0292 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $40 | $0 | 0.0 | I | |
|
|