1,058 Recommendations Found
RESET
|
| ID |
Description |
Savings |
Cost |
Payback |
Impstatus |
|
|
| MA0644 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $34,492 | $160,000 | 4.6 | I | | MA0644 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,900 | $0 | 0.0 | I | | MA0644 | REDUCE VENTILATION AIR | $11,580 | $25,000 | 2.2 | I | | MA0644 | REDUCE VENTILATION AIR | $6,015 | $2,600 | 0.4 | I | | MA0644 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,937 | $0 | 0.0 | I | | MA0639 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,993 | $70,840 | 2.2 | I | | MA0639 | INSTALL TIMERS AND/OR THERMOSTATS | $12,707 | $975 | 0.1 | I | | MA0639 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,426 | $27,000 | 3.6 | I | | MA0639 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $2,000 | 6.2 | I | | MA0640 | REDUCE VENTILATION AIR | $36,692 | $39,000 | 1.1 | I | | MA0640 | OPTIMIZE PLANT POWER FACTOR | $11,811 | $11,850 | 1.0 | I | | MA0640 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | 1.6 | I | | MA0640 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | 0.0 | I | | MA0640 | INSULATE STEAM / HOT WATER LINES | $644 | $689 | 1.1 | I | | MA0641 | INSULATE STEAM / HOT WATER LINES | $3,028 | $3,000 | 1.0 | I | | MA0631 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,384 | $27,090 | 1.8 | I | | MA0631 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,021 | $0 | 0.0 | I | | MA0631 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $609 | $0 | 0.0 | I | | MA0631 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $350 | $200 | 0.6 | I | | MA0638 | REDUCE VENTILATION AIR | $12,360 | $2,500 | 0.2 | I | | MA0638 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,761 | $0 | 0.0 | I | | MA0638 | INSULATE STEAM / HOT WATER LINES | $1,670 | $3,000 | 1.8 | I | | MA0638 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,230 | $2,000 | 1.6 | I | | MA0637 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $180,534 | $80,000 | 0.4 | I | | MA0637 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $24,017 | $14,000 | 0.6 | I | |
|
|