2,425 Recommendations Found
RESET
|
| ID |
Description |
Savings |
Cost |
Payback |
Impstatus |
|
|
| IC0157 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,204 | $363 | 0.3 | I | | IC0157 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,162 | $4,848 | 1.5 | I | | IC0157 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,780 | $9,923 | 3.6 | I | | IC0157 | INSTALL OCCUPANCY SENSORS | $968 | $1,964 | 2.0 | I | | IC0157 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,603 | $805 | 0.5 | I | | IC0157 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,436 | $1,524 | 0.6 | I | | IC0157 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $162,607 | $289,000 | 1.8 | I | | IC0157 | DISCONNECT BALLASTS | $4,133 | $1,070 | 0.3 | I | | BD0357 | INSTALL OCCUPANCY SENSORS | $389 | $300 | 0.8 | I | | BD0357 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $600 | $0 | 0.0 | I | | BD0357 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,672 | $1,000 | 0.4 | I | | BD0357 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,111 | $0 | 0.0 | I | | BD0357 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,905 | $0 | 0.0 | I | | IC0148 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $261 | $300 | 1.1 | I | | IC0148 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $156 | $102 | 0.7 | I | | IC0148 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,693 | 1.7 | I | | IC0148 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $476 | $1,278 | 2.7 | I | | IC0148 | USE POWER DURING OFF-PEAK PERIODS | $55 | $0 | 0.0 | I | | IC0148 | INSULATE BARE EQUIPMENT | $1,124 | $913 | 0.8 | I | | IC0148 | BURN WASTE OIL FOR HEAT | $4,155 | $0 | 0.0 | I | | BD0350 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,713 | $8,173 | 0.7 | I | | BD0350 | INSTALL OCCUPANCY SENSORS | $4,266 | $2,560 | 0.6 | I | | BD0350 | USE PHOTOCELL CONTROLS | $1,126 | $450 | 0.4 | I | | BD0350 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,395 | $8,740 | 1.0 | I | | BD0350 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,724 | $625 | 0.1 | I | |
|
|