392 Recommendations Found
RESET
|
| ID |
Description |
Savings |
Cost |
Payback |
Impstatus |
|
|
| GT0870 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $625 | $0 | 0.0 | n/a | | GT0870 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,570 | $1,000 | 0.2 | n/a | | GT0870 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,245 | $20,050 | 2.2 | n/a | | GT0870 | INSTALL OCCUPANCY SENSORS | $5,810 | $620 | 0.1 | n/a | | GT0870 | USE SYNTHETIC LUBRICANT | $43,210 | $0 | 0.0 | n/a | | GT0870 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $1,500 | $6,399 | 4.3 | n/a | | GT0870 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,910 | $45,000 | 1.3 | n/a | | GT0870 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,796 | $7,656 | 1.6 | n/a | | MA0653 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $110,550 | $270,000 | 2.4 | n/a | | MA0653 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $37,210 | $68,000 | 1.8 | n/a | | MA0653 | REDUCE VENTILATION AIR | $16,188 | $752 | 0.0 | n/a | | MA0653 | CLOSE OFF UNNEEDED STEAM LINES | $3,551 | $500 | 0.1 | n/a | | MA0653 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | 2.6 | n/a | | MA0653 | USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | $2,375 | $6,125 | 2.6 | n/a | | GT0867 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,318 | $89,971 | 1.7 | n/a | | GT0867 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,794 | $4,000 | 0.5 | n/a | | GT0867 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,426 | $3,250 | 0.2 | n/a | | GT0867 | ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | $14,518 | $6,000 | 0.4 | n/a | | GT0867 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,949 | $0 | 0.0 | n/a | | GT0867 | USE SYNTHETIC LUBRICANT | $1,440 | $0 | 0.0 | n/a | | LE0291 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $32,078 | $50,000 | 1.6 | n/a | | LE0291 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,489 | $510 | 0.0 | n/a | | LE0291 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,557 | $2,500 | 0.2 | n/a | | LE0291 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,457 | $1,120 | 0.2 | n/a | | LE0291 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,439 | $1,600 | 0.3 | n/a | |
|
|