| ARC |
|
Description |
Recommendations |
Average Recommended Savings |
Average Payback |
|
2.xxxx
|
 |
ENERGY MANAGEMENT
|
621 |
$9,385 |
1.3 |
|
2.1xxx
|
 |
Combustion Systems
|
17 |
$15,180 |
1.2 |
|
2.11xx
|
 |
FURNACES, OVENS AND DIRECTLY FIRED OPERATIONS
|
2 |
$5,348 |
1.0 |
|
2.111x
|
 |
Operations
|
1 |
$2,508 |
2.0 |
|
2.1111
|
|
CONTROL PRESSURE ON STEAMER OPERATIONS
|
0 |
$0 |
0.0 |
|
2.1112
|
|
HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION
|
0 |
$0 |
0.0 |
|
2.1113
|
|
REDUCE COMBUSTION AIR FLOW TO OPTIMUM
|
0 |
$0 |
0.0 |
|
2.1114
|
|
LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE
|
0 |
$0 |
0.0 |
|
2.1115
|
|
ELIMINATE COMBUSTIBLE GAS IN FLUE GAS
|
0 |
$0 |
0.0 |
|
2.1116
|
|
IMPROVE COMBUSTION CONTROL CAPABILITY
|
1 |
$2,508 |
2.0 |
|
2.1117
|
|
RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION
|
0 |
$0 |
0.0 |
|
|
2.112x
|
 |
Hardware
|
0 |
$0 |
0.0 |
|
2.1121
|
|
USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING
|
0 |
$0 |
0.0 |
|
2.1122
|
|
RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.1123
|
|
INSTALL AUTOMATIC STACK DAMPER
|
0 |
$0 |
0.0 |
|
2.1124
|
|
REPLACE DIRECT FIRED WITH STEAM HEAT
|
0 |
$0 |
0.0 |
|
2.1125
|
|
CONVERT TO OXYFUEL BURNERS
|
0 |
$0 |
0.0 |
|
|
2.113x
|
 |
Maintenance
|
1 |
$8,188 |
0.0 |
|
2.1131
|
|
REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC
|
0 |
$0 |
0.0 |
|
2.1132
|
|
REPAIR FAULTY LOUVERS AND DAMPERS
|
0 |
$0 |
0.0 |
|
2.1133
|
|
ADJUST BURNERS FOR EFFICIENT OPERATION
|
1 |
$8,188 |
0.0 |
|
2.1134
|
|
ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES
|
0 |
$0 |
0.0 |
|
2.1135
|
|
REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY
|
0 |
$0 |
0.0 |
|
|
|
2.12xx
|
 |
BOILERS
|
13 |
$11,568 |
0.7 |
|
2.121x
|
 |
Operation
|
1 |
$6,891 |
0.6 |
|
2.1211
|
|
MOVE BOILER TO MORE EFFICIENT LOCATION
|
0 |
$0 |
0.0 |
|
2.1212
|
|
OPERATE BOILERS ON HIGH FIRE SETTING
|
0 |
$0 |
0.0 |
|
2.1213
|
|
DIRECT WARMEST AIR TO COMBUSTION INTAKE
|
1 |
$6,891 |
0.6 |
|
|
2.122x
|
 |
Hardware
|
3 |
$11,339 |
2.2 |
|
2.1221
|
|
REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES
|
1 |
$26,169 |
1.2 |
|
2.1222
|
|
INSTALL TURBULATORS
|
1 |
$2,094 |
0.7 |
|
2.1223
|
|
INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE)
|
0 |
$0 |
0.0 |
|
2.1224
|
|
REPLACE BOILER
|
1 |
$5,753 |
4.7 |
|
|
2.123x
|
 |
Maintenance
|
9 |
$12,164 |
0.2 |
|
2.1231
|
|
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS
|
0 |
$0 |
0.0 |
|
2.1232
|
|
KEEP BOILER TUBES CLEAN
|
0 |
$0 |
0.0 |
|
2.1233
|
|
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO
|
9 |
$12,164 |
0.2 |
|
|
2.124x
|
 |
Blowdown
|
0 |
$0 |
0.0 |
|
2.1241
|
|
REDUCE EXCESSIVE BOILER BLOWDOWN
|
0 |
$0 |
0.0 |
|
2.1242
|
|
MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT
|
0 |
$0 |
0.0 |
|
2.1243
|
|
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER
|
0 |
$0 |
0.0 |
|
|
|
2.13xx
|
 |
FUEL SWITCHING
|
2 |
$48,490 |
4.3 |
|
2.131x
|
 |
Electric to Fossil Fuel
|
0 |
$0 |
0.0 |
|
2.1311
|
|
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT
|
0 |
$0 |
0.0 |
|
|
2.132x
|
 |
Fossil Fuel to Electric
|
1 |
$1,183 |
4.2 |
|
2.1321
|
|
REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT
|
1 |
$1,183 |
4.2 |
|
2.1322
|
|
USE ELECTRIC HEAT IN PLACE OF FOSSIL FUEL HEATING SYSTEM
|
0 |
$0 |
0.0 |
|
2.1323
|
|
REPLACE GAS-FIRED ABSORPTION AIR CONDITIONERS WITH ELECTRIC UNITS
|
0 |
$0 |
0.0 |
|
|
2.133x
|
 |
Alternate Fuel
|
1 |
$95,797 |
4.4 |
|
2.1331
|
|
BURN A LESS EXPENSIVE GRADE OF FUEL
|
0 |
$0 |
0.0 |
|
2.1332
|
|
CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS
|
0 |
$0 |
0.0 |
|
2.1333
|
|
CONVERT COMBUSTION EQUIPMENT TO BURN OIL
|
0 |
$0 |
0.0 |
|
2.1334
|
|
CONVERT OIL OR GAS BURNERS TO COMBUSTION OF COAL
|
0 |
$0 |
0.0 |
|
2.1335
|
|
REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS
|
0 |
$0 |
0.0 |
|
2.1336
|
|
INSTALL EQUIPMENT TO UTILIZE WASTE FUEL
|
1 |
$95,797 |
4.4 |
|
|
2.139x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
2.1391
|
|
REPLACE PURCHASED STEAM WITH ELECTRIC HEATING
|
0 |
$0 |
0.0 |
|
2.1392
|
|
REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE
|
0 |
$0 |
0.0 |
|
2.1393
|
|
USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING
|
0 |
$0 |
0.0 |
|
2.1394
|
|
REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS
|
0 |
$0 |
0.0 |
|
|
|
|
2.2xxx
|
 |
Thermal Systems
|
71 |
$32,967 |
1.8 |
|
2.21xx
|
 |
STEAM
|
7 |
$82,683 |
0.4 |
|
2.211x
|
 |
Traps
|
2 |
$283,622 |
0.2 |
|
2.2111
|
|
INSTALL STEAM TRAP
|
0 |
$0 |
0.0 |
|
2.2112
|
|
USE CORRECT SIZE STEAM TRAPS
|
0 |
$0 |
0.0 |
|
2.2113
|
|
REPAIR OR REPLACE STEAM TRAPS
|
2 |
$283,622 |
0.2 |
|
2.2114
|
|
SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE
|
0 |
$0 |
0.0 |
|
|
2.212x
|
 |
Condensate
|
0 |
$0 |
0.0 |
|
2.2121
|
|
INCREASE AMOUNT OF CONDENSATE RETURNED
|
0 |
$0 |
0.0 |
|
2.2122
|
|
INSTALL / REPAIR INSULATION ON CONDENSATE LINES
|
0 |
$0 |
0.0 |
|
2.2123
|
|
INSULATE FEEDWATER TANK
|
0 |
$0 |
0.0 |
|
2.2124
|
|
INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK
|
0 |
$0 |
0.0 |
|
2.2125
|
|
REPLACE BAROMETRIC CONDENSERS WITH SURFACE CONDENSERS
|
0 |
$0 |
0.0 |
|
2.2126
|
|
LOWER OPERATING PRESSURE OF CONDENSER (STEAM)
|
0 |
$0 |
0.0 |
|
2.2127
|
|
FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM
|
0 |
$0 |
0.0 |
|
2.2128
|
|
USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE)
|
0 |
$0 |
0.0 |
|
|
2.213x
|
 |
Leaks and Insulation
|
5 |
$2,307 |
0.4 |
|
2.2131
|
|
INSULATE STEAM / HOT WATER LINES
|
2 |
$210 |
1.1 |
|
2.2132
|
|
REPAIR FAULTY INSULATION ON STEAM LINES
|
0 |
$0 |
0.0 |
|
2.2133
|
|
REPAIR LEAKS IN LINES AND VALVES
|
1 |
$1,103 |
0.0 |
|
2.2134
|
|
ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS
|
0 |
$0 |
0.0 |
|
2.2135
|
|
REPAIR AND ELIMINATE STEAM LEAKS
|
2 |
$5,006 |
0.0 |
|
|
2.214x
|
 |
Distillation
|
0 |
$0 |
0.0 |
|
2.2141
|
|
OPERATE DISTILLATION COLUMNS EFFICIENTLY
|
0 |
$0 |
0.0 |
|
2.2142
|
|
UPGRADE DISTILLATION HARDWARE
|
0 |
$0 |
0.0 |
|
|
2.215x
|
 |
Maintenance
|
0 |
$0 |
0.0 |
|
2.2151
|
|
CLEAN STEAM COILS IN PROCESSING TANKS
|
0 |
$0 |
0.0 |
|
2.2152
|
|
MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM
|
0 |
$0 |
0.0 |
|
2.2153
|
|
CLOSE OFF UNNEEDED STEAM LINES
|
0 |
$0 |
0.0 |
|
|
2.216x
|
 |
Operations
|
0 |
$0 |
0.0 |
|
2.2161
|
|
OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS
|
0 |
$0 |
0.0 |
|
2.2162
|
|
REDUCE EXCESS STEAM BLEEDING
|
0 |
$0 |
0.0 |
|
2.2163
|
|
USE MINIMUM STEAM OPERATING PRESSURE
|
0 |
$0 |
0.0 |
|
2.2164
|
|
TURN OFF STEAM TRACING DURING MILD WEATHER
|
0 |
$0 |
0.0 |
|
2.2165
|
|
SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL
|
0 |
$0 |
0.0 |
|
|
2.219x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
2.2191
|
|
SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM
|
0 |
$0 |
0.0 |
|
2.2192
|
|
USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS
|
0 |
$0 |
0.0 |
|
|
|
2.22xx
|
 |
HEATING
|
2 |
$491 |
3.2 |
|
2.221x
|
 |
Operation
|
1 |
$163 |
6.4 |
|
2.2211
|
|
USE OPTIMUM TEMPERATURE
|
1 |
$163 |
6.4 |
|
2.2212
|
|
USE MINIMUM SAFE OVEN VENTILATION
|
0 |
$0 |
0.0 |
|
|
2.222x
|
 |
Hardware
|
1 |
$818 |
0.0 |
|
2.2221
|
|
USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC
|
0 |
$0 |
0.0 |
|
2.2222
|
|
CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING
|
0 |
$0 |
0.0 |
|
2.2223
|
|
ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF
|
1 |
$818 |
0.0 |
|
|
|
2.23xx
|
 |
HEAT TREATING
|
0 |
$0 |
0.0 |
|
2.231x
|
 |
General
|
0 |
$0 |
0.0 |
|
2.2311
|
|
HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS
|
0 |
$0 |
0.0 |
|
2.2312
|
|
MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS
|
0 |
$0 |
0.0 |
|
2.2313
|
|
USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED
|
0 |
$0 |
0.0 |
|
2.2314
|
|
REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT
|
0 |
$0 |
0.0 |
|
|
|
2.24xx
|
 |
HEAT RECOVERY
|
27 |
$40,391 |
1.4 |
|
2.241x
|
 |
Flue Gas Recuperation
|
8 |
$27,008 |
1.5 |
|
2.2411
|
|
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR
|
8 |
$27,008 |
1.5 |
|
2.2412
|
|
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER
|
0 |
$0 |
0.0 |
|
2.2413
|
|
USE HOT FLUE GASES TO PREHEAT WASTES FOR INCINERATOR BOILER
|
0 |
$0 |
0.0 |
|
|
2.242x
|
 |
Flue Gas - Other Uses
|
0 |
$0 |
0.0 |
|
2.2421
|
|
INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER
|
0 |
$0 |
0.0 |
|
2.2422
|
|
USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM
|
0 |
$0 |
0.0 |
|
2.2423
|
|
INSTALL WASTE HEAT BOILER TO PRODUCE STEAM
|
0 |
$0 |
0.0 |
|
2.2424
|
|
USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS
|
0 |
$0 |
0.0 |
|
2.2425
|
|
USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER
|
0 |
$0 |
0.0 |
|
2.2426
|
|
USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR
|
0 |
$0 |
0.0 |
|
2.2427
|
|
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS
|
0 |
$0 |
0.0 |
|
2.2428
|
|
USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC
|
0 |
$0 |
0.0 |
|
|
2.243x
|
 |
Heat Recovery from Specific Equipment
|
18 |
$21,093 |
1.4 |
|
2.2431
|
|
RECOVER HEAT FROM TRANSFORMERS
|
0 |
$0 |
0.0 |
|
2.2432
|
|
RECOVER HEAT FROM OVEN EXHAUST / KILNS
|
2 |
$62,087 |
0.7 |
|
2.2433
|
|
RECOVER HEAT FROM ENGINE EXHAUSTS
|
0 |
$0 |
0.0 |
|
2.2434
|
|
RECOVER HEAT FROM AIR COMPRESSOR
|
13 |
$4,426 |
1.4 |
|
2.2435
|
|
RECOVER HEAT FROM COMPRESSED AIR DRYERS
|
0 |
$0 |
0.0 |
|
2.2436
|
|
RECOVER HEAT FROM REFRIGERATION CONDENSERS
|
0 |
$0 |
0.0 |
|
2.2437
|
|
RECOVER WASTE HEAT FROM EQUIPMENT
|
3 |
$65,988 |
1.8 |
|
|
2.244x
|
 |
Other Process Waste Heat
|
1 |
$494,826 |
0.9 |
|
2.2441
|
|
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT
|
0 |
$0 |
0.0 |
|
2.2442
|
|
PREHEAT COMBUSTION AIR WITH WASTE HEAT
|
0 |
$0 |
0.0 |
|
2.2443
|
|
RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR
|
0 |
$0 |
0.0 |
|
2.2444
|
|
USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS
|
0 |
$0 |
0.0 |
|
2.2445
|
|
RECOVER HEAT FROM EXHAUSTED STEAM
|
1 |
$494,826 |
0.9 |
|
2.2446
|
|
RECOVER HEAT FROM HOT WASTE WATER
|
0 |
$0 |
0.0 |
|
2.2447
|
|
HEAT WATER WITH EXHAUST HEAT
|
0 |
$0 |
0.0 |
|
|
2.249x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
2.2491
|
|
USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING
|
0 |
$0 |
0.0 |
|
2.2492
|
|
USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR
|
0 |
$0 |
0.0 |
|
2.2493
|
|
USE RECOVERED HEAT FROM LIGHTING FIXTURES FOR USEFUL PURPOSE
|
0 |
$0 |
0.0 |
|
2.2494
|
|
RECOVER HEAT IN DOMESTIC HOT WATER GOING TO DRAIN
|
0 |
$0 |
0.0 |
|
2.2495
|
|
USE EXHAUST HEAT FROM BUILDING FOR SNOW AND ICE REMOVAL
|
0 |
$0 |
0.0 |
|
2.2496
|
|
HEAT SERVICE HOT WATER WITH AIR CONDITIONING EQUIPMENT
|
0 |
$0 |
0.0 |
|
|
|
2.25xx
|
 |
HEAT CONTAINMENT
|
15 |
$9,788 |
2.1 |
|
2.251x
|
 |
Insulation
|
10 |
$14,301 |
1.1 |
|
2.2511
|
|
INSULATE BARE EQUIPMENT
|
8 |
$2,850 |
1.1 |
|
2.2512
|
|
INCREASE INSULATION THICKNESS
|
2 |
$60,105 |
1.2 |
|
2.2513
|
|
COVER OPEN TANKS WITH FLOATING INSULATION
|
0 |
$0 |
0.0 |
|
2.2514
|
|
COVER OPEN TANKS
|
0 |
$0 |
0.0 |
|
2.2515
|
|
USE OPTIMUM THICKNESS INSULATION
|
0 |
$0 |
0.0 |
|
2.2516
|
|
USE ECONOMIC THICKNESS OF INSULATION FOR LOW TEMPERATURES
|
0 |
$0 |
0.0 |
|
|
2.252x
|
 |
Isolation
|
3 |
$513 |
2.5 |
|
2.2521
|
|
ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS
|
0 |
$0 |
0.0 |
|
2.2522
|
|
ISOLATE HOT OR COLD EQUIPMENT
|
1 |
$658 |
2.6 |
|
2.2523
|
|
REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS
|
2 |
$440 |
2.4 |
|
2.2524
|
|
AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED
|
0 |
$0 |
0.0 |
|
2.2525
|
|
ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA
|
0 |
$0 |
0.0 |
|
|
2.253x
|
 |
Infiltration
|
2 |
$1,141 |
6.4 |
|
2.2531
|
|
RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR
|
1 |
$2,156 |
9.7 |
|
2.2532
|
|
USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD
|
0 |
$0 |
0.0 |
|
2.2533
|
|
REPLACE AIR CURTAIN DOORS WITH SOLID DOORS
|
1 |
$126 |
3.1 |
|
|
|
2.26xx
|
 |
COOLING
|
19 |
$27,417 |
2.6 |
|
2.261x
|
 |
Cooling Towers
|
1 |
$14,438 |
2.2 |
|
2.2611
|
|
MODERATE COOLING TOWER OUTLET TEMPERATURE
|
0 |
$0 |
0.0 |
|
2.2612
|
|
USE COOLING TOWER WATER INSTEAD OF REFRIGERATION
|
0 |
$0 |
0.0 |
|
2.2613
|
|
USE ANTIFREEZE IN COOLING TOWERS TO ALLOW WINTER USE
|
0 |
$0 |
0.0 |
|
2.2614
|
|
USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING
|
1 |
$14,438 |
2.2 |
|
2.2615
|
|
CLEAN CONDENSER TUBES
|
0 |
$0 |
0.0 |
|
|
2.262x
|
 |
Chillers and Refrigeration
|
16 |
$23,630 |
2.8 |
|
2.2621
|
|
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE
|
1 |
$7,071 |
1.2 |
|
2.2622
|
|
REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL
|
3 |
$96,712 |
2.6 |
|
2.2623
|
|
MINIMIZE CONDENSER COOLING WATER TEMPERATURE
|
0 |
$0 |
0.0 |
|
2.2624
|
|
USE COLD WASTE WATER TO COOL CHILLER FEED WATER
|
0 |
$0 |
0.0 |
|
2.2625
|
|
CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE
|
3 |
$1,874 |
0.1 |
|
2.2626
|
|
AVOID FROST FORMATION ON EVAPORATORS
|
0 |
$0 |
0.0 |
|
2.2627
|
|
USE MULTIPLE-EFFECT EVAPORATORS
|
0 |
$0 |
0.0 |
|
2.2628
|
|
UTILIZE A LESS EXPENSIVE COOLING METHOD
|
9 |
$8,362 |
4.0 |
|
|
2.269x
|
 |
Miscellaneous
|
2 |
$64,196 |
1.3 |
|
2.2691
|
|
SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS
|
1 |
$8,272 |
1.9 |
|
2.2692
|
|
USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER
|
0 |
$0 |
0.0 |
|
2.2693
|
|
USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION
|
1 |
$120,120 |
0.6 |
|
2.2694
|
|
USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE
|
0 |
$0 |
0.0 |
|
2.2695
|
|
USE CASCADE SYSTEM OF RECIRCULATING DURING COLD WEATHER TO AVOID SUB-COOLING
|
0 |
$0 |
0.0 |
|
2.2696
|
|
USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS
|
0 |
$0 |
0.0 |
|
|
|
2.27xx
|
 |
DRYING
|
1 |
$2,611 |
1.7 |
|
2.271x
|
 |
Use of Air
|
1 |
$2,611 |
1.7 |
|
2.2711
|
|
UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING
|
1 |
$2,611 |
1.7 |
|
|
|
|
2.3xxx
|
 |
Electrical Power
|
24 |
$19,575 |
1.7 |
|
2.31xx
|
 |
DEMAND MANAGEMENT
|
14 |
$20,719 |
0.8 |
|
2.311x
|
 |
Thermal Energy Storage
|
1 |
$162,249 |
1.9 |
|
2.3111
|
|
HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE
|
0 |
$0 |
0.0 |
|
2.3112
|
|
STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS
|
0 |
$0 |
0.0 |
|
2.3113
|
|
MAKE ICE DURING OFF PEAK HOURS FOR COOLING
|
1 |
$162,249 |
1.9 |
|
|
2.313x
|
 |
Scheduling
|
11 |
$10,822 |
0.5 |
|
2.3131
|
|
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS
|
6 |
$10,272 |
0.8 |
|
2.3132
|
|
RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS
|
3 |
$6,838 |
0.0 |
|
2.3133
|
|
CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY
|
0 |
$0 |
0.0 |
|
2.3134
|
|
SHIFT FROM DAYTIME TO NIGHTTIME OPERATION
|
0 |
$0 |
0.0 |
|
2.3135
|
|
SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS
|
0 |
$0 |
0.0 |
|
2.3136
|
|
OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS
|
0 |
$0 |
0.0 |
|
2.3137
|
|
USE POWER DURING OFF-PEAK PERIODS
|
2 |
$18,449 |
0.4 |
|
|
2.319x
|
 |
Miscellaneous
|
2 |
$4,390 |
1.9 |
|
2.3191
|
|
USE DEMAND CONTROLLER OR LOAD SHEDDER
|
2 |
$4,390 |
1.9 |
|
2.3192
|
|
USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS
|
0 |
$0 |
0.0 |
|
|
|
2.32xx
|
 |
POWER FACTOR
|
9 |
$11,237 |
2.3 |
|
2.321x
|
 |
General
|
9 |
$11,237 |
2.3 |
|
2.3211
|
|
USE POWER FACTOR CONTROLLERS
|
1 |
$6,000 |
0.9 |
|
2.3212
|
|
OPTIMIZE PLANT POWER FACTOR
|
8 |
$11,892 |
2.5 |
|
|
|
2.33xx
|
 |
GENERATION OF POWER
|
0 |
$0 |
0.0 |
|
2.331x
|
 |
DC
|
0 |
$0 |
0.0 |
|
2.3311
|
|
REPLACE DC EQUIPMENT WITH AC EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.3312
|
|
INSTALL EFFICIENT RECTIFIERS
|
0 |
$0 |
0.0 |
|
|
2.332x
|
 |
AC
|
0 |
$0 |
0.0 |
|
2.3321
|
|
USE STEAM PRESSURE REDUCTION TO GENERATE POWER
|
0 |
$0 |
0.0 |
|
2.3322
|
|
USE EXISTING DAM TO GENERATE ELECTRICITY
|
0 |
$0 |
0.0 |
|
2.3323
|
|
INSTALL EMISSIONS CONTROLS TO INCREASE CAPACITY
|
0 |
$0 |
0.0 |
|
|
|
2.34xx
|
 |
COGENERATION
|
1 |
$78,590 |
9.5 |
|
2.341x
|
 |
General
|
1 |
$78,590 |
9.5 |
|
2.3411
|
|
REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT
|
0 |
$0 |
0.0 |
|
2.3412
|
|
USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR
|
0 |
$0 |
0.0 |
|
2.3413
|
|
BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT
|
0 |
$0 |
0.0 |
|
2.3414
|
|
BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT
|
0 |
$0 |
0.0 |
|
2.3415
|
|
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT
|
1 |
$78,590 |
9.5 |
|
2.3416
|
|
USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST
|
0 |
$0 |
0.0 |
|
2.3417
|
|
USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT
|
0 |
$0 |
0.0 |
|
|
|
2.35xx
|
 |
TRANSMISSION
|
0 |
$0 |
0.0 |
|
2.351x
|
 |
Transformers
|
0 |
$0 |
0.0 |
|
2.3511
|
|
USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS
|
0 |
$0 |
0.0 |
|
2.3512
|
|
DE-ENERGIZE EXCESS TRANSFORMER CAPACITY
|
0 |
$0 |
0.0 |
|
2.3513
|
|
CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS
|
0 |
$0 |
0.0 |
|
|
2.352x
|
 |
Conductor Size
|
0 |
$0 |
0.0 |
|
2.3521
|
|
REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES
|
0 |
$0 |
0.0 |
|
2.3522
|
|
INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES
|
0 |
$0 |
0.0 |
|
|
|
|
2.4xxx
|
 |
Motor Systems
|
231 |
$4,318 |
0.7 |
|
2.41xx
|
 |
MOTORS
|
62 |
$5,288 |
1.2 |
|
2.411x
|
 |
Operation
|
17 |
$3,063 |
0.5 |
|
2.4111
|
|
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS
|
16 |
$2,423 |
0.4 |
|
2.4112
|
|
INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS
|
1 |
$13,305 |
3.2 |
|
2.4113
|
|
INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS
|
0 |
$0 |
0.0 |
|
|
2.413x
|
 |
Hardware
|
19 |
$3,299 |
1.6 |
|
2.4131
|
|
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE
|
3 |
$2,794 |
1.3 |
|
2.4132
|
|
SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY
|
0 |
$0 |
0.0 |
|
2.4133
|
|
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS
|
16 |
$3,394 |
1.7 |
|
2.4134
|
|
REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE
|
0 |
$0 |
0.0 |
|
|
2.414x
|
 |
Motor System Drives
|
17 |
$7,327 |
1.8 |
|
2.4141
|
|
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS
|
8 |
$8,963 |
1.2 |
|
2.4142
|
|
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET
|
1 |
$7,495 |
1.9 |
|
2.4143
|
|
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM
|
1 |
$338 |
3.8 |
|
2.4144
|
|
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE
|
7 |
$6,432 |
2.2 |
|
2.4145
|
|
INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE
|
0 |
$0 |
0.0 |
|
|
2.415x
|
 |
Motor Maintenance/Repair
|
9 |
$9,838 |
0.7 |
|
2.4151
|
|
DEVELOP A REPAIR/REPLACE POLICY
|
6 |
$5,681 |
0.9 |
|
2.4152
|
|
USE ONLY CERTIFIED MOTOR REPAIR SHOPS
|
0 |
$0 |
0.0 |
|
2.4153
|
|
AVOID EMERGENCY REWIND OF MOTORS
|
0 |
$0 |
0.0 |
|
2.4154
|
|
AVOID REWINDING MOTORS MORE THAN TWICE
|
0 |
$0 |
0.0 |
|
2.4155
|
|
STANDARDIZE MOTOR INVENTORY
|
0 |
$0 |
0.0 |
|
2.4156
|
|
ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM
|
1 |
$47,500 |
0.5 |
|
2.4157
|
|
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM
|
2 |
$3,479 |
0.3 |
|
|
|
2.42xx
|
 |
AIR COMPRESSORS
|
148 |
$3,712 |
0.5 |
|
2.422x
|
 |
Hardware
|
43 |
$2,760 |
0.8 |
|
2.4221
|
|
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS
|
28 |
$2,147 |
0.7 |
|
2.4222
|
|
INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN
|
2 |
$2,476 |
0.8 |
|
2.4223
|
|
INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM
|
1 |
$5,833 |
0.1 |
|
2.4224
|
|
UPGRADE CONTROLS ON COMPRESSORS
|
9 |
$2,896 |
0.6 |
|
2.4225
|
|
INSTALL COMMON HEADER ON COMPRESSORS
|
0 |
$0 |
0.0 |
|
2.4226
|
|
USE / PURCHASE OPTIMUM SIZED COMPRESSOR
|
3 |
$7,240 |
2.2 |
|
2.4227
|
|
USE COMPRESSOR AIR FILTERS
|
0 |
$0 |
0.0 |
|
|
2.423x
|
 |
Operations
|
105 |
$4,103 |
0.4 |
|
2.4231
|
|
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED
|
38 |
$2,654 |
0.4 |
|
2.4232
|
|
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING
|
10 |
$7,024 |
0.5 |
|
2.4233
|
|
ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR
|
1 |
$2,100 |
0.0 |
|
2.4234
|
|
COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER
|
0 |
$0 |
0.0 |
|
2.4235
|
|
REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES
|
1 |
$1,835 |
0.7 |
|
2.4236
|
|
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES
|
53 |
$4,740 |
0.4 |
|
2.4237
|
|
SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING
|
1 |
$1,860 |
0.1 |
|
2.4238
|
|
DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING
|
1 |
$2,645 |
1.8 |
|
|
|
2.43xx
|
 |
OTHER EQUIPMENT
|
21 |
$5,725 |
0.8 |
|
2.431x
|
 |
Operations
|
10 |
$983 |
0.3 |
|
2.4311
|
|
RECOVER MECHANICAL ENERGY
|
0 |
$0 |
0.0 |
|
2.4312
|
|
IMPROVE LUBRICATION PRACTICES
|
1 |
$1,108 |
1.8 |
|
2.4313
|
|
PROVIDE PROPER MAINTENANCE / OF MOTOR DRIVEN EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.4314
|
|
USE SYNTHETIC LUBRICANT
|
9 |
$969 |
0.2 |
|
|
2.432x
|
 |
Hardware
|
11 |
$10,036 |
1.2 |
|
2.4321
|
|
UPGRADE OBSOLETE EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.4322
|
|
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES
|
6 |
$9,002 |
1.1 |
|
2.4323
|
|
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT
|
1 |
$3,001 |
0.6 |
|
2.4324
|
|
REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT
|
4 |
$13,347 |
1.3 |
|
2.4325
|
|
UPGRADE CONVEYORS
|
0 |
$0 |
0.0 |
|
|
|
|
2.5xxx
|
 |
Industrial Design
|
3 |
$27,317 |
2.1 |
|
2.51xx
|
 |
SYSTEMS
|
3 |
$27,317 |
2.1 |
|
2.511x
|
 |
Thermal
|
1 |
$62,965 |
1.1 |
|
2.5111
|
|
CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS
|
1 |
$62,965 |
1.1 |
|
2.5112
|
|
USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER
|
0 |
$0 |
0.0 |
|
2.5113
|
|
USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING
|
0 |
$0 |
0.0 |
|
2.5114
|
|
USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL
|
0 |
$0 |
0.0 |
|
2.5115
|
|
REPOSITION OVEN WALLS TO REDUCE HEATED SPACE
|
0 |
$0 |
0.0 |
|
2.5116
|
|
USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS
|
0 |
$0 |
0.0 |
|
2.5117
|
|
CONVERT TO INDIRECT TEMPERATURE CONTROL SYSTEM
|
0 |
$0 |
0.0 |
|
|
2.512x
|
 |
Mechanical
|
2 |
$9,493 |
2.6 |
|
2.5121
|
|
REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH
|
1 |
$2,149 |
5.1 |
|
2.5122
|
|
REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS
|
0 |
$0 |
0.0 |
|
2.5123
|
|
REDUCE FLUID FLOW RATES
|
1 |
$16,836 |
0.1 |
|
2.5124
|
|
USE GRAVITY FEEDS WHEREVER POSSIBLE
|
0 |
$0 |
0.0 |
|
2.5125
|
|
SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE
|
0 |
$0 |
0.0 |
|
|
2.519x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
2.5191
|
|
MODIFY DYE BECK
|
0 |
$0 |
0.0 |
|
2.5192
|
|
MODIFY TEXTILE DRYERS
|
0 |
$0 |
0.0 |
|
2.5193
|
|
CONVERT FROM BATCH TO CONTINUOUS OPERATION
|
0 |
$0 |
0.0 |
|
2.5194
|
|
REDESIGN PROCESS
|
0 |
$0 |
0.0 |
|
2.5195
|
|
CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS
|
0 |
$0 |
0.0 |
|
2.5196
|
|
USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS
|
0 |
$0 |
0.0 |
|
2.5197
|
|
AVOID ELECTRICALLY-POWERED ANIMATED DISPLAYS
|
0 |
$0 |
0.0 |
|
|
|
|
2.6xxx
|
 |
Operations
|
28 |
$4,215 |
0.6 |
|
2.61xx
|
 |
MAINTENANCE
|
3 |
$572 |
0.2 |
|
2.612x
|
 |
General
|
3 |
$572 |
0.2 |
|
2.6121
|
|
REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED
|
0 |
$0 |
0.0 |
|
2.6122
|
|
ADJUST VENTS TO MINIMIZE ENERGY USE
|
0 |
$0 |
0.0 |
|
2.6123
|
|
REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS
|
1 |
$30 |
0.0 |
|
2.6124
|
|
ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE
|
0 |
$0 |
0.0 |
|
2.6125
|
|
KEEP EQUIPMENT CLEAN
|
1 |
$1,555 |
0.3 |
|
2.6126
|
|
KEEP SOLID FUELS / RAW MATERIALS DRY
|
0 |
$0 |
0.0 |
|
2.6127
|
|
MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT
|
1 |
$130 |
0.3 |
|
|
|
2.62xx
|
 |
EQUIPMENT CONTROL
|
25 |
$4,652 |
0.6 |
|
2.621x
|
 |
Equipment Use Reduction
|
16 |
$4,739 |
0.6 |
|
2.6211
|
|
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES
|
2 |
$644 |
1.7 |
|
2.6212
|
|
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME
|
3 |
$1,530 |
0.5 |
|
2.6213
|
|
TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS
|
0 |
$0 |
0.0 |
|
2.6214
|
|
SHUT OFF PILOTS IN STANDBY EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.6215
|
|
SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON
|
0 |
$0 |
0.0 |
|
2.6216
|
|
SHUT OFF COOLING WATER WHEN NOT REQUIRED
|
0 |
$0 |
0.0 |
|
2.6217
|
|
SHUT OFF ALL LABORATORY FUME HOODS WHEN NOT IN USE
|
0 |
$0 |
0.0 |
|
2.6218
|
|
TURN OFF EQUIPMENT WHEN NOT IN USE
|
11 |
$6,359 |
0.4 |
|
|
2.622x
|
 |
Equipment Scheduling
|
2 |
$3,305 |
0.7 |
|
2.6221
|
|
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY
|
1 |
$4,039 |
0.3 |
|
2.6222
|
|
USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS
|
0 |
$0 |
0.0 |
|
2.6223
|
|
SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY
|
0 |
$0 |
0.0 |
|
2.6224
|
|
SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS
|
1 |
$2,571 |
1.2 |
|
2.6225
|
|
ELIMINATE THIRD SHIFT
|
0 |
$0 |
0.0 |
|
2.6226
|
|
OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE
|
0 |
$0 |
0.0 |
|
|
2.623x
|
 |
Equipment Automation
|
6 |
$4,459 |
0.8 |
|
2.6231
|
|
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED
|
5 |
$4,816 |
1.0 |
|
2.6232
|
|
INSTALL SET-BACK TIMERS
|
1 |
$2,676 |
0.0 |
|
|
2.624x
|
 |
Load Reduction
|
1 |
$7,118 |
0.3 |
|
2.6241
|
|
REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY
|
0 |
$0 |
0.0 |
|
2.6242
|
|
MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION
|
1 |
$7,118 |
0.3 |
|
|
|
|
2.7xxx
|
 |
Building and Grounds
|
233 |
$5,538 |
1.5 |
|
2.71xx
|
 |
LIGHTING
|
155 |
$4,413 |
1.5 |
|
2.711x
|
 |
Level
|
17 |
$3,235 |
1.9 |
|
2.7111
|
|
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS
|
17 |
$3,235 |
1.9 |
|
2.7112
|
|
REDUCE EXTERIOR ILLUMINATION TO MINIMUM SAFE LEVEL
|
0 |
$0 |
0.0 |
|
|
2.712x
|
 |
Operation
|
13 |
$1,740 |
0.2 |
|
2.7121
|
|
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT
|
2 |
$1,442 |
0.3 |
|
2.7122
|
|
DISCONNECT BALLASTS
|
4 |
$682 |
0.5 |
|
2.7123
|
|
KEEP LAMPS AND REFLECTORS CLEAN
|
0 |
$0 |
0.0 |
|
2.7124
|
|
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED
|
7 |
$2,430 |
0.1 |
|
|
2.713x
|
 |
Controls
|
40 |
$2,157 |
1.0 |
|
2.7131
|
|
ADD AREA LIGHTING SWITCHES
|
2 |
$8,943 |
0.1 |
|
2.7132
|
|
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS
|
1 |
$603 |
0.1 |
|
2.7133
|
|
USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE
|
0 |
$0 |
0.0 |
|
2.7134
|
|
USE PHOTOCELL CONTROLS
|
5 |
$353 |
0.6 |
|
2.7135
|
|
INSTALL OCCUPANCY SENSORS
|
32 |
$2,063 |
1.1 |
|
|
2.714x
|
 |
Hardware
|
85 |
$6,118 |
1.9 |
|
2.7141
|
|
LOWER LIGHT FIXTURES IN HIGH CEILING AREAS
|
2 |
$7,002 |
0.1 |
|
2.7142
|
|
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS
|
61 |
$6,678 |
1.9 |
|
2.7143
|
|
USE MORE EFFICIENT LIGHT SOURCE
|
17 |
$4,004 |
1.6 |
|
2.7144
|
|
INSTALL SPECTRAL REFLECTORS / DELAMP
|
2 |
$783 |
4.3 |
|
2.7145
|
|
INSTALL SKYLIGHTS
|
3 |
$9,685 |
3.2 |
|
|
|
2.72xx
|
 |
SPACE CONDITIONING
|
54 |
$8,807 |
1.7 |
|
2.721x
|
 |
Maintenance
|
1 |
$1,776 |
5.1 |
|
2.7211
|
|
CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS
|
1 |
$1,776 |
5.1 |
|
2.7212
|
|
INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS
|
0 |
$0 |
0.0 |
|
|
2.722x
|
 |
Operation
|
12 |
$3,689 |
1.4 |
|
2.7221
|
|
LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA
|
5 |
$3,979 |
0.2 |
|
2.7222
|
|
AIR CONDITION ONLY SPACE IN USE
|
1 |
$2,285 |
0.1 |
|
2.7223
|
|
CONDITION SMALLEST SPACE NECESSARY
|
2 |
$795 |
4.2 |
|
2.7224
|
|
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS
|
0 |
$0 |
0.0 |
|
2.7225
|
|
CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS
|
0 |
$0 |
0.0 |
|
2.7226
|
|
USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE
|
1 |
$17,491 |
1.5 |
|
2.7227
|
|
USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY
|
0 |
$0 |
0.0 |
|
2.7228
|
|
AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM
|
3 |
$1,001 |
1.7 |
|
|
2.723x
|
 |
Hardware - Heating / Cooling
|
12 |
$14,885 |
3.2 |
|
2.7231
|
|
USE RADIANT HEATER FOR SPOT HEATING
|
4 |
$7,364 |
0.9 |
|
2.7232
|
|
REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL
|
8 |
$18,646 |
4.4 |
|
2.7233
|
|
USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT
|
0 |
$0 |
0.0 |
|
2.7234
|
|
USE HEAT PUMP FOR SPACE CONDITIONING
|
0 |
$0 |
0.0 |
|
2.7235
|
|
INSTALL FOSSIL FUEL MAKE-UP AIR UNIT
|
0 |
$0 |
0.0 |
|
|
2.724x
|
 |
Hardware - Air Circulation
|
16 |
$8,273 |
1.8 |
|
2.7241
|
|
INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT
|
5 |
$13,728 |
1.5 |
|
2.7242
|
|
CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES
|
2 |
$7,740 |
0.0 |
|
2.7243
|
|
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS
|
9 |
$5,362 |
2.4 |
|
2.7244
|
|
REVISE SMOKE CLEANUP FROM OPERATIONS
|
0 |
$0 |
0.0 |
|
2.7245
|
|
USE DIRECT AIR SUPPLY TO EXHAUST HOODS
|
0 |
$0 |
0.0 |
|
|
2.725x
|
 |
Evaporation
|
0 |
$0 |
0.0 |
|
2.7251
|
|
REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF
|
0 |
$0 |
0.0 |
|
2.7252
|
|
UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM
|
0 |
$0 |
0.0 |
|
|
2.726x
|
 |
Controls
|
11 |
$8,626 |
0.2 |
|
2.7261
|
|
INSTALL TIMERS AND/OR THERMOSTATS
|
10 |
$8,289 |
0.2 |
|
2.7262
|
|
SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS
|
0 |
$0 |
0.0 |
|
2.7263
|
|
LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION
|
0 |
$0 |
0.0 |
|
2.7264
|
|
INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION
|
1 |
$12,000 |
0.2 |
|
|
2.727x
|
 |
Humidity Control
|
2 |
$11,829 |
0.5 |
|
2.7271
|
|
REPLACE ELECTRIC REHEAT WITH HEAT PIPES
|
0 |
$0 |
0.0 |
|
2.7272
|
|
INSTALL HEAT PIPES / RAISE COOLING SETPOINT
|
1 |
$1,725 |
0.0 |
|
2.7273
|
|
INSTALL DESICCANT HUMIDITY CONTROL SYSTEM
|
1 |
$21,932 |
1.1 |
|
|
2.729x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
2.7291
|
|
RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS
|
0 |
$0 |
0.0 |
|
2.7292
|
|
LOWER CEILING TO REDUCE CONDITIONED SPACE
|
0 |
$0 |
0.0 |
|
2.7293
|
|
INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS
|
0 |
$0 |
0.0 |
|
|
|
2.73xx
|
 |
VENTILTION
|
8 |
$4,399 |
1.0 |
|
2.731x
|
 |
General
|
8 |
$4,399 |
1.0 |
|
2.7311
|
|
VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE
|
0 |
$0 |
0.0 |
|
2.7312
|
|
MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE
|
1 |
$1,426 |
0.9 |
|
2.7313
|
|
RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING
|
5 |
$5,947 |
0.7 |
|
2.7314
|
|
REDUCE VENTILATION AIR
|
1 |
$1,638 |
0.1 |
|
2.7315
|
|
REDUCE BUILDING VENTILATION AIR TO MINIMUM SAFE LEVELS
|
1 |
$2,391 |
3.6 |
|
2.7316
|
|
CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN
|
0 |
$0 |
0.0 |
|
|
|
2.74xx
|
 |
BUILDING ENVELOPE
|
16 |
$5,973 |
1.3 |
|
2.742x
|
 |
Solar Loading
|
1 |
$786 |
0.0 |
|
2.7421
|
|
REDUCE GLAZED AREAS IN BUILDINGS
|
0 |
$0 |
0.0 |
|
2.7422
|
|
PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT
|
0 |
$0 |
0.0 |
|
2.7423
|
|
REDUCE HEAT GAIN BY WINDOW TINTING
|
0 |
$0 |
0.0 |
|
2.7424
|
|
SHADE WINDOWS FROM SUMMER SUN
|
0 |
$0 |
0.0 |
|
2.7425
|
|
CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD
|
1 |
$786 |
0.0 |
|
|
2.744x
|
 |
Infiltration
|
9 |
$5,524 |
0.9 |
|
2.7441
|
|
REPLACE BROKEN WINDOWS AND/OR WINDOW SASH
|
0 |
$0 |
0.0 |
|
2.7442
|
|
KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE
|
0 |
$0 |
0.0 |
|
2.7443
|
|
AIR SEALS AROUND TRUCK LOADING DOCK DOORS
|
2 |
$2,090 |
0.8 |
|
2.7444
|
|
CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS
|
2 |
$387 |
0.3 |
|
2.7445
|
|
INSTALL WEATHER STRIPPING ON WINDOWS AND DOORS
|
1 |
$3,482 |
0.1 |
|
2.7446
|
|
UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS
|
0 |
$0 |
0.0 |
|
2.7447
|
|
INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS
|
4 |
$10,321 |
1.4 |
|
|
2.749x
|
 |
Miscellaneous
|
6 |
$7,510 |
2.0 |
|
2.7491
|
|
INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS
|
1 |
$17,331 |
2.6 |
|
2.7492
|
|
USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE
|
3 |
$8,751 |
1.8 |
|
2.7493
|
|
USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES
|
0 |
$0 |
0.0 |
|
2.7494
|
|
INSTALL STORM WINDOWS AND DOORS
|
0 |
$0 |
0.0 |
|
2.7495
|
|
INSTALL REPLACEMENT DOORS
|
0 |
$0 |
0.0 |
|
2.7496
|
|
INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE
|
2 |
$739 |
2.1 |
|
|
|
|
2.8xxx
|
 |
Ancillary Costs
|
9 |
$19,771 |
0.2 |
|
2.81xx
|
 |
ADMINISTRATIVE
|
9 |
$19,771 |
0.2 |
|
2.811x
|
 |
Utility Costs
|
6 |
$24,399 |
0.2 |
|
2.8111
|
|
CHECK FOR ACCURACY OF UTILITY METERS
|
1 |
$5,395 |
0.0 |
|
2.8112
|
|
COMBINE UTILITY METERS
|
2 |
$6,219 |
0.6 |
|
2.8113
|
|
PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER
|
2 |
$59,539 |
0.0 |
|
2.8114
|
|
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE
|
1 |
$9,482 |
0.0 |
|
2.8115
|
|
BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED
|
0 |
$0 |
0.0 |
|
2.8116
|
|
CHECK FOR ACCURACY OF POWER METER
|
0 |
$0 |
0.0 |
|
|
2.812x
|
 |
Fiscal
|
3 |
$10,514 |
0.1 |
|
2.8121
|
|
APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES
|
2 |
$3,772 |
0.2 |
|
2.8122
|
|
USE UTILITY CONTROLLED POWER MANAGEMENT
|
1 |
$24,000 |
0.0 |
|
2.8123
|
|
PAY UTILITY BILLS ON TIME
|
0 |
$0 |
0.0 |
|
|
|
2.82xx
|
 |
SHIPPING, DISTRIBUTION, AND TRANSPORTATION
|
0 |
$0 |
0.0 |
|
2.821x
|
 |
Shipping
|
0 |
$0 |
0.0 |
|
2.8211
|
|
CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES
|
0 |
$0 |
0.0 |
|
2.8212
|
|
REDUCE DELIVERY SCHEDULES
|
0 |
$0 |
0.0 |
|
|
2.822x
|
 |
Vehicles
|
0 |
$0 |
0.0 |
|
2.8221
|
|
CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS
|
0 |
$0 |
0.0 |
|
2.8222
|
|
SIZE TRUCKS TO JOB
|
0 |
$0 |
0.0 |
|
2.8223
|
|
ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE
|
0 |
$0 |
0.0 |
|
2.8224
|
|
SHUT DOWN TRUCK ENGINES WHILE LOADING, UNLOADING, OR WAITING
|
0 |
$0 |
0.0 |
|
2.8225
|
|
SCHEDULE REGULAR MAINTENANCE TO MAINTAIN TRUCK ENGINES
|
0 |
$0 |
0.0 |
|
2.8226
|
|
INCREASE EFFICIENCY OF TRUCKS
|
0 |
$0 |
0.0 |
|
2.8227
|
|
ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION
|
0 |
$0 |
0.0 |
|
|
|
|
2.9xxx
|
 |
Alternative Energy Usage
|
5 |
$18,809 |
8.0 |
|
2.91xx
|
 |
GENERAL
|
5 |
$18,809 |
8.0 |
|
2.911x
|
 |
Solar
|
5 |
$18,809 |
8.0 |
|
2.9111
|
|
USE SOLAR HEAT TO HEAT MAKE-UP AIR
|
1 |
$20,592 |
4.9 |
|
2.9112
|
|
USE SOLAR HEAT TO HEAT WATER
|
1 |
$358 |
7.8 |
|
2.9113
|
|
USE SOLAR HEAT FOR HEAT
|
0 |
$0 |
0.0 |
|
2.9114
|
|
USE SOLAR HEAT TO MAKE ELECTRICTY
|
3 |
$24,365 |
9.1 |
|
|
2.912x
|
 |
Wind Power
|
0 |
$0 |
0.0 |
|
2.9121
|
|
INSTALL WIND POWERED ELECTRIC GENERATOR
|
0 |
$0 |
0.0 |
|
|
2.913x
|
 |
Hydrogen
|
0 |
$0 |
0.0 |
|
2.9131
|
|
INSTALL HYDROGEN FUEL CELL
|
0 |
$0 |
0.0 |
|
|
2.914x
|
 |
Biofuels
|
0 |
$0 |
0.0 |
|
2.9141
|
|
Install Anaerobic Digester
|
0 |
$0 |
0.0 |
|
|
|
|
|
3.xxxx
|
 |
WASTE MINIMIZATION / POLLUTION PREVENTION
|
25 |
$19,325 |
0.9 |
|
3.1xxx
|
 |
Operations
|
2 |
$47,315 |
0.0 |
|
3.11xx
|
 |
Procedures
|
2 |
$47,315 |
0.0 |
|
3.111x
|
 |
Process Specific
|
0 |
$0 |
0.0 |
|
3.1111
|
|
COVER INK CONTAINERS WHEN NOT IN USE
|
0 |
$0 |
0.0 |
|
3.1112
|
|
USE DEDICATED PRESSES FOR EACH COLOR
|
0 |
$0 |
0.0 |
|
3.1113
|
|
USE GLASS MARBLES TO RAISE FLUID LEVELS OF CHEMICALS TO THE BRIM TO REDUCE CONTACT WITH ATMOSPHERIC OXYGEN
|
0 |
$0 |
0.0 |
|
3.1114
|
|
REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL
|
0 |
$0 |
0.0 |
|
3.1115
|
|
ORDER PAINT PIGMENTS IN PASTE FORM INSTEAD OF DRY POWDER TO ELIMINATE HAZARDOUS DUST WASTE
|
0 |
$0 |
0.0 |
|
3.1116
|
|
REPAIR / UPGRADE GRATE CONVEYORS TO MINIMIZE LOSS OF COAL FINES
|
0 |
$0 |
0.0 |
|
|
3.112x
|
 |
Material Application
|
0 |
$0 |
0.0 |
|
3.1121
|
|
USE MORE EFFICIENT ADHESIVE APPLICATORS
|
0 |
$0 |
0.0 |
|
3.1122
|
|
SWITCH FROM AUTOMATIC TO HAND APPLICATION
|
0 |
$0 |
0.0 |
|
|
3.113x
|
 |
Stripping
|
0 |
$0 |
0.0 |
|
3.1131
|
|
USE MECHANICAL STRIPPING METHODS
|
0 |
$0 |
0.0 |
|
3.1132
|
|
USE CRYOGENIC STRIPPING
|
0 |
$0 |
0.0 |
|
|
3.114x
|
 |
Scheduling
|
0 |
$0 |
0.0 |
|
3.1141
|
|
SCHEDULE JOBS TO MINIMIZE THE NEED FOR CLEANUP (COLORS)
|
0 |
$0 |
0.0 |
|
3.1142
|
|
SCHEDULE PRODUCTION RUNS TO MINIMIZE COLOR CHANGES
|
0 |
$0 |
0.0 |
|
|
3.115x
|
 |
Desulfurization / Slag Management
|
0 |
$0 |
0.0 |
|
3.1151
|
|
TREAT DESULFURIZATION SLAG IN A DEEP QUENCH TANK INSTEAD OF SPRAYING WATER ONTO AN OPEN PILE TO REDUCE AIR EMISSIONS
|
0 |
$0 |
0.0 |
|
3.1152
|
|
USE HIGH QUALITY SCRAP (LOW SULFUR) TO REDUCE HAZARDOUS SLUDGE GENERATION
|
0 |
$0 |
0.0 |
|
3.1153
|
|
ALTER PRODUCT REQUIREMENTS TO ELIMINATE UNNECESSARY USE OF DESULFURIZING AGENT (CALCIUM CARBIDE)
|
0 |
$0 |
0.0 |
|
3.1154
|
|
USE AN ALTERNATIVE DESULFURIZING AGENT TO ELIMINATE HAZARDOUS SLAG FORMATION
|
0 |
$0 |
0.0 |
|
|
3.116x
|
 |
Reduction / Elimination
|
0 |
$0 |
0.0 |
|
3.1161
|
|
ELIMINATE/REDUCE AN OPERATION
|
0 |
$0 |
0.0 |
|
3.1162
|
|
USE LESS WASTEFUL PACKAGING
|
0 |
$0 |
0.0 |
|
3.1163
|
|
USE PLASTIC PALLETS INSTEAD OF WOOD
|
0 |
$0 |
0.0 |
|
|
3.117x
|
 |
Product Specifications
|
0 |
$0 |
0.0 |
|
3.1171
|
|
CHANGE PRODUCT SPECS
|
0 |
$0 |
0.0 |
|
3.1172
|
|
REVISE RAW MATERIAL SPECS
|
0 |
$0 |
0.0 |
|
3.1173
|
|
USE A DIFFERENT RAW MATERIAL
|
0 |
$0 |
0.0 |
|
3.1174
|
|
USE A RECYCLED RAW MATERIAL
|
0 |
$0 |
0.0 |
|
|
3.118x
|
 |
By-product Use
|
0 |
$0 |
0.0 |
|
3.1181
|
|
ELIMINATE A BY-PRODUCT
|
0 |
$0 |
0.0 |
|
3.1182
|
|
MAKE A NEW BY-PRODUCT
|
0 |
$0 |
0.0 |
|
|
3.119x
|
 |
Miscellaneous
|
2 |
$47,315 |
0.0 |
|
3.1191
|
|
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS
|
0 |
$0 |
0.0 |
|
3.1192
|
|
REDUCE SCRAP PRODUCTION
|
2 |
$47,315 |
0.0 |
|
3.1193
|
|
CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING
|
0 |
$0 |
0.0 |
|
3.1194
|
|
USE AUTOMATIC FLOW CONTROL
|
0 |
$0 |
0.0 |
|
3.1195
|
|
USE SILHOUETTE ENTRY COVER TO REDUCE EVAPORATION AREA
|
0 |
$0 |
0.0 |
|
3.1196
|
|
MONITOR SOLUTIONS TO MAINTAIN SOLUTION STRENGTH
|
0 |
$0 |
0.0 |
|
|
|
3.12xx
|
 |
Waste Stream Contamination
|
0 |
$0 |
0.0 |
|
3.122x
|
 |
Rinsing Strategies
|
0 |
$0 |
0.0 |
|
3.1221
|
|
USE REACTIVE RINSING
|
0 |
$0 |
0.0 |
|
3.1222
|
|
REDUCE WATER USE WITH COUNTER CURRENT RINSING
|
0 |
$0 |
0.0 |
|
3.1223
|
|
USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING
|
0 |
$0 |
0.0 |
|
3.1224
|
|
MECHANICALLY AND AIR AGITATE RINSE TANKS FOR COMPLETE MIXING
|
0 |
$0 |
0.0 |
|
3.1225
|
|
USE A STILL RINSE AS THE INITIAL RINSING STAGE
|
0 |
$0 |
0.0 |
|
3.1226
|
|
USE COUNTER CURRENT WASHING IN PHOTO PROCESSORS
|
0 |
$0 |
0.0 |
|
3.1227
|
|
USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE)
|
0 |
$0 |
0.0 |
|
|
3.124x
|
 |
Dragout Reduction
|
0 |
$0 |
0.0 |
|
3.1241
|
|
SLOW INSERTION / WITHDRAWAL OF PARTS FROM DEGREASING TANK
|
0 |
$0 |
0.0 |
|
3.1242
|
|
ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT
|
0 |
$0 |
0.0 |
|
3.1243
|
|
PRE-INSPECT PARTS TO PREVENT DRAG-IN OF SOLVENTS / CLEANERS
|
0 |
$0 |
0.0 |
|
3.1244
|
|
REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS
|
0 |
$0 |
0.0 |
|
3.1245
|
|
EXTEND SOLUTION LIFE BY MINIMIZING DRAG-IN
|
0 |
$0 |
0.0 |
|
3.1246
|
|
LOWER THE CONCENTRATION OF PLATING BATHS
|
0 |
$0 |
0.0 |
|
3.1247
|
|
USE DRAG-OUT REDUCTION METHODS (GRAVURE)-SEE SURFACE COATING
|
0 |
$0 |
0.0 |
|
|
3.129x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
3.1291
|
|
ELIMINATE PRACTICE OF MIXING WASTE STREAMS
|
0 |
$0 |
0.0 |
|
3.1292
|
|
DEVELOP SEGREGATED SEWER SYSTEMS
|
0 |
$0 |
0.0 |
|
3.1293
|
|
SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE
|
0 |
$0 |
0.0 |
|
3.1294
|
|
SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS
|
0 |
$0 |
0.0 |
|
3.1295
|
|
USE SQUEEGEES TO PREVENT CHEMICAL CARRY-OVER
|
0 |
$0 |
0.0 |
|
3.1296
|
|
AVOID CONTAMINATION OF SCRAP GLASS AND REUSE AS FEED STOCK
|
0 |
$0 |
0.0 |
|
|
|
3.13xx
|
 |
CAD/CAM
|
0 |
$0 |
0.0 |
|
3.131x
|
 |
General
|
0 |
$0 |
0.0 |
|
3.1311
|
|
OPTIMIZE DYE DESIGN
|
0 |
$0 |
0.0 |
|
|
|
|
3.2xxx
|
 |
Equipment
|
1 |
$68,000 |
2.1 |
|
3.21xx
|
 |
General
|
1 |
$68,000 |
2.1 |
|
3.211x
|
 |
Fault Tolerance
|
0 |
$0 |
0.0 |
|
3.2111
|
|
INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE
|
0 |
$0 |
0.0 |
|
|
3.212x
|
 |
Painting Operations
|
0 |
$0 |
0.0 |
|
3.2121
|
|
CONVERT TO ELECTROSTATIC POWDER COATING
|
0 |
$0 |
0.0 |
|
3.2122
|
|
CONVERT FROM WATER CURTAIN SPRAY BOOTHS TO A DRY SYSTEM
|
0 |
$0 |
0.0 |
|
3.2123
|
|
CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS
|
0 |
$0 |
0.0 |
|
3.2124
|
|
CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS
|
0 |
$0 |
0.0 |
|
|
3.213x
|
 |
Process Specific Upgrades
|
0 |
$0 |
0.0 |
|
3.2131
|
|
INSTALL MIXERS ON EACH CLEANING TANK
|
0 |
$0 |
0.0 |
|
3.2132
|
|
INCREASE FREEBOARD SPACE / INSTALL CHILLERS ON VAPOR DEGREASERS
|
0 |
$0 |
0.0 |
|
3.2133
|
|
ELIMINATE CHEM ETCHING & PLATING BY USING ALTERNATIVE PRINT TECHNOLOGIES(PRE SENSITIZED LITHO,PLASTIC OR PHOTO POLYMER,
|
0 |
$0 |
0.0 |
|
3.2134
|
|
USE HIGH PURITY ANODES TO INCREASE SOLUTION LIFE
|
0 |
$0 |
0.0 |
|
3.2135
|
|
EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING
|
0 |
$0 |
0.0 |
|
3.2136
|
|
USE "WASH-LESS" PROCESSING EQUIPMENT
|
0 |
$0 |
0.0 |
|
3.2137
|
|
USE INDUCTION FURNACES INSTEAD OF ELECTRIC ARC OR CUPOLA FURNACES TO REDUCE DUST AND FUMES
|
0 |
$0 |
0.0 |
|
|
3.214x
|
 |
Tank Design
|
0 |
$0 |
0.0 |
|
3.2141
|
|
USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE
|
0 |
$0 |
0.0 |
|
3.2142
|
|
USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS
|
0 |
$0 |
0.0 |
|
|
3.216x
|
 |
System Monitoring
|
0 |
$0 |
0.0 |
|
3.2161
|
|
CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE
|
0 |
$0 |
0.0 |
|
3.2162
|
|
INSTALL WEB BREAK DETECTORS TO PREVENT EXCESSIVE WASTE PAPER
|
0 |
$0 |
0.0 |
|
3.2163
|
|
USE INK WATER RATIO SENSOR
|
0 |
$0 |
0.0 |
|
|
3.217x
|
 |
Automation
|
1 |
$68,000 |
2.1 |
|
3.2171
|
|
USE AN AUTOMATIC PLATE PROCESSOR
|
0 |
$0 |
0.0 |
|
3.2172
|
|
USE AUTOMATIC CLEANING EQUIPMENT
|
0 |
$0 |
0.0 |
|
3.2173
|
|
CONVERT TO ROBOTIC PAINTING
|
0 |
$0 |
0.0 |
|
3.2174
|
|
AUTOMATE INK MIXING
|
0 |
$0 |
0.0 |
|
3.2175
|
|
USE AUTOMATED PLATE BENDERS
|
0 |
$0 |
0.0 |
|
3.2176
|
|
INCREASE USE OF AUTOMATION
|
1 |
$68,000 |
2.1 |
|
|
|
|
3.3xxx
|
 |
Post Generation Treatment / Minimization
|
0 |
$0 |
0.0 |
|
3.31xx
|
 |
General
|
0 |
$0 |
0.0 |
|
3.311x
|
 |
Neutralization
|
0 |
$0 |
0.0 |
|
3.3111
|
|
ADJUST PH FOR NEUTRALIZATION
|
0 |
$0 |
0.0 |
|
3.3112
|
|
UTILIZE OXIDATION/REDUCTION FOR NEUTRALIZATION
|
0 |
$0 |
0.0 |
|
3.3113
|
|
USE OTHER METHODS FOR NEUTRALIZATION
|
0 |
$0 |
0.0 |
|
|
3.312x
|
 |
Removal of Contaminants
|
0 |
$0 |
0.0 |
|
3.3121
|
|
USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3122
|
|
USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3123
|
|
USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3124
|
|
USE CYCLONE SEPARATION TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3125
|
|
USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3126
|
|
USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3127
|
|
USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
3.3128
|
|
UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS
|
0 |
$0 |
0.0 |
|
|
3.313x
|
 |
Material Concentration
|
0 |
$0 |
0.0 |
|
3.3131
|
|
USE EVAPORATION TO CONCENTRATE MATERIAL
|
0 |
$0 |
0.0 |
|
3.3132
|
|
USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL
|
0 |
$0 |
0.0 |
|
3.3133
|
|
USE OTHER WASTE CONCENTRATION METHODS
|
0 |
$0 |
0.0 |
|
|
|
|
3.4xxx
|
 |
Water Use
|
7 |
$5,102 |
1.5 |
|
3.41xx
|
 |
General
|
7 |
$5,102 |
1.5 |
|
3.411x
|
 |
Close Cycle Water Use
|
1 |
$23,420 |
0.1 |
|
3.4111
|
|
USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION
|
0 |
$0 |
0.0 |
|
3.4112
|
|
RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER
|
0 |
$0 |
0.0 |
|
3.4113
|
|
TREAT AND REUSE RINSE WATERS
|
0 |
$0 |
0.0 |
|
3.4114
|
|
REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER
|
0 |
$0 |
0.0 |
|
3.4115
|
|
RECOVER AND REUSE COOLING WATER
|
0 |
$0 |
0.0 |
|
3.4116
|
|
METER RECYCLED WATER (TO REDUCE SEWER CHARGES)
|
1 |
$23,420 |
0.1 |
|
|
3.413x
|
 |
Water Quality
|
0 |
$0 |
0.0 |
|
3.4131
|
|
MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT
|
0 |
$0 |
0.0 |
|
3.4132
|
|
USE DEIONIZED WATER IN UPSTREAM RINSE TANKS
|
0 |
$0 |
0.0 |
|
3.4133
|
|
CLEAN FOULING FROM WATER LINES REGULARLY
|
0 |
$0 |
0.0 |
|
|
3.414x
|
 |
Water Treatment
|
0 |
$0 |
0.0 |
|
3.4141
|
|
REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE
|
0 |
$0 |
0.0 |
|
3.4142
|
|
RECYCLE CHLORINATION STAGE PROCESS WATER
|
0 |
$0 |
0.0 |
|
3.4143
|
|
USE WATER FROM THE WASHING SYSTEM IN THE CHLORINATION STAGE
|
0 |
$0 |
0.0 |
|
3.4144
|
|
PERFORM HIGH CONSISTENCY GAS PHASE CHLORINATION
|
0 |
$0 |
0.0 |
|
3.4145
|
|
USE MAGNETIC TECHNOLOGY TO TREAT WATER
|
0 |
$0 |
0.0 |
|
3.4146
|
|
CHANGE METHOD OF DEIONIZED WATER PRODUCTION
|
0 |
$0 |
0.0 |
|
|
3.415x
|
 |
Reduction
|
6 |
$2,049 |
1.8 |
|
3.4151
|
|
MINIMIZE WATER USAGE
|
2 |
$611 |
4.7 |
|
3.4152
|
|
CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT
|
0 |
$0 |
0.0 |
|
3.4153
|
|
USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER
|
0 |
$0 |
0.0 |
|
3.4154
|
|
ELIMINATE LEAKS IN WATER LINES AND VALVES
|
3 |
$3,345 |
0.1 |
|
3.4155
|
|
METER WASTE WATER
|
1 |
$1,036 |
0.9 |
|
3.4156
|
|
USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE
|
0 |
$0 |
0.0 |
|
3.4157
|
|
REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING
|
0 |
$0 |
0.0 |
|
3.4158
|
|
USE MINIMUM COOLING WATER TO BEARINGS
|
0 |
$0 |
0.0 |
|
3.4159
|
|
REPLACE TREATED WATER WITH WELL / SURFACE WATER
|
0 |
$0 |
0.0 |
|
|
|
|
3.5xxx
|
 |
Recycling
|
6 |
$10,714 |
1.0 |
|
3.51xx
|
 |
Liquid Waste
|
0 |
$0 |
0.0 |
|
3.511x
|
 |
Oil
|
0 |
$0 |
0.0 |
|
3.5111
|
|
FILTER AND REUSE HYDRAULIC OIL
|
0 |
$0 |
0.0 |
|
3.5112
|
|
REPROCESS SPENT OILS ON SITE FOR RE-USE
|
0 |
$0 |
0.0 |
|
3.5113
|
|
SELL OIL TO RECYCLER
|
0 |
$0 |
0.0 |
|
|
3.512x
|
 |
Ink
|
0 |
$0 |
0.0 |
|
3.5121
|
|
RECYCLE WASTE INK AND CLEANUP SOLVENT
|
0 |
$0 |
0.0 |
|
|
3.513x
|
 |
White Water
|
0 |
$0 |
0.0 |
|
3.5131
|
|
RECYCLE WHITE WATER
|
0 |
$0 |
0.0 |
|
3.5132
|
|
REUSE RICH WHITE WATER IN OTHER APPLICATIONS
|
0 |
$0 |
0.0 |
|
|
3.514x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
3.5141
|
|
RECOVER DYE FROM WASTE WATERS
|
0 |
$0 |
0.0 |
|
3.5142
|
|
TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS
|
0 |
$0 |
0.0 |
|
3.5143
|
|
RETURN SPENT SOLUTIONS TO THE MANUFACTURER
|
0 |
$0 |
0.0 |
|
3.5144
|
|
RECYCLE SPENT TANNING SOLUTION
|
0 |
$0 |
0.0 |
|
3.5145
|
|
RECOVER AND REUSE SPENT ACID BATHS
|
0 |
$0 |
0.0 |
|
3.5146
|
|
UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID
|
0 |
$0 |
0.0 |
|
|
|
3.52xx
|
 |
Solid Waste
|
2 |
$24,496 |
0.1 |
|
3.521x
|
 |
General
|
2 |
$24,496 |
0.1 |
|
3.5211
|
|
REUSE SCRAP GLASS AS FEED STOCK
|
0 |
$0 |
0.0 |
|
3.5212
|
|
REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS
|
0 |
$0 |
0.0 |
|
3.5213
|
|
REUSE SCRAP PRINTED PAPER FOR MAKE-READY
|
0 |
$0 |
0.0 |
|
3.5214
|
|
AVOID CONTAMINATION OF FLASHING / REJECT S AND USE AS FEED STOCK
|
0 |
$0 |
0.0 |
|
3.5215
|
|
AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK
|
0 |
$0 |
0.0 |
|
3.5216
|
|
RECYCLE NONFERROUS DUST
|
0 |
$0 |
0.0 |
|
3.5217
|
|
REUSE / RECYCLE/ SELL PAPER PRODUCTS
|
2 |
$24,496 |
0.1 |
|
3.5218
|
|
REUSE / RECYCLE/ SELL RUBBER PRODUCTS
|
0 |
$0 |
0.0 |
|
|
3.522x
|
 |
Sand
|
0 |
$0 |
0.0 |
|
3.5221
|
|
RECYCLE CASTING SAND
|
0 |
$0 |
0.0 |
|
3.5222
|
|
USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS)
|
0 |
$0 |
0.0 |
|
|
3.524x
|
 |
Metals
|
0 |
$0 |
0.0 |
|
3.5241
|
|
SELL USED PLATES TO AN ALUMINUM RECYCLER
|
0 |
$0 |
0.0 |
|
3.5242
|
|
RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE
|
0 |
$0 |
0.0 |
|
3.5243
|
|
RECYCLE FILM FOR SILVER RECOVERY
|
0 |
$0 |
0.0 |
|
3.5244
|
|
RECOVER METALS FROM CASTING SAND
|
0 |
$0 |
0.0 |
|
3.5245
|
|
SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY
|
0 |
$0 |
0.0 |
|
3.5246
|
|
SEGREGATE METALS FOR SALE TO A RECYCLER
|
0 |
$0 |
0.0 |
|
3.5247
|
|
SEPARATE IRON FROM SLAG AND REMELT
|
0 |
$0 |
0.0 |
|
|
|
3.53xx
|
 |
Other Materials
|
4 |
$3,823 |
1.5 |
|
3.531x
|
 |
General
|
4 |
$3,823 |
1.5 |
|
3.5311
|
|
RECOVER AND REUSE WASTE MATERIAL
|
1 |
$50 |
0.0 |
|
3.5312
|
|
SALVAGE AND RE-USE PROCESS WASTE
|
0 |
$0 |
0.0 |
|
3.5313
|
|
INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE
|
0 |
$0 |
0.0 |
|
3.5314
|
|
USE IN-PROCESS RECYCLING WHENEVER POSSIBLE
|
0 |
$0 |
0.0 |
|
3.5315
|
|
LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER
|
2 |
$5,140 |
3.0 |
|
3.5316
|
|
CONTRACT A WOOD PALLET RECYCLING COMPANY
|
1 |
$4,963 |
0.1 |
|
3.5317
|
|
SELL / OFFER BY-PRODUCT AS ANIMAL FEED
|
0 |
$0 |
0.0 |
|
3.5318
|
|
RECYCLE FLUORESCENT LAMPS
|
0 |
$0 |
0.0 |
|
|
|
|
3.6xxx
|
 |
Waste Disposal
|
3 |
$33,542 |
0.7 |
|
3.61xx
|
 |
General
|
3 |
$33,542 |
0.7 |
|
3.611x
|
 |
Sludge Maintenance
|
0 |
$0 |
0.0 |
|
3.6111
|
|
USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME
|
0 |
$0 |
0.0 |
|
3.6112
|
|
USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME
|
0 |
$0 |
0.0 |
|
3.6113
|
|
REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS
|
0 |
$0 |
0.0 |
|
3.6114
|
|
USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE
|
0 |
$0 |
0.0 |
|
|
3.612x
|
 |
Combustion of Waste Products
|
2 |
$24,495 |
0.6 |
|
3.6121
|
|
BURN WASTE PAPER FOR HEAT
|
1 |
$47,700 |
0.3 |
|
3.6122
|
|
INSTALL SOLID WASTE INCINERATOR FOR HEAT
|
0 |
$0 |
0.0 |
|
3.6123
|
|
BURN WOOD BY-PRODUCTS FOR HEAT
|
0 |
$0 |
0.0 |
|
3.6124
|
|
BURN WASTE OIL FOR HEAT
|
1 |
$1,290 |
0.9 |
|
3.6125
|
|
SELL COMBUSTIBLE WASTE
|
0 |
$0 |
0.0 |
|
3.6126
|
|
DIRECT WASTE GASSES TO BOILER COMBUSTION AIR
|
0 |
$0 |
0.0 |
|
|
3.619x
|
 |
Miscellaneous
|
1 |
$51,637 |
0.9 |
|
3.6191
|
|
RETURN SPENT SOLUTIONS TO THE MANUFACTURER
|
0 |
$0 |
0.0 |
|
3.6192
|
|
USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL
|
0 |
$0 |
0.0 |
|
3.6193
|
|
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS
|
1 |
$51,637 |
0.9 |
|
3.6194
|
|
SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM
|
0 |
$0 |
0.0 |
|
|
|
|
3.7xxx
|
 |
Maintenance
|
5 |
$18,359 |
0.3 |
|
3.71xx
|
 |
Cleaning / Degreasing
|
4 |
$22,608 |
0.0 |
|
3.711x
|
 |
Mechanical Cleaning
|
0 |
$0 |
0.0 |
|
3.7111
|
|
USE VACUUM FOR SPILL CLEANUP INSTEAD OF ABSORBENT
|
0 |
$0 |
0.0 |
|
3.7112
|
|
USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING
|
0 |
$0 |
0.0 |
|
3.7113
|
|
USE MECHANICAL WIPERS FOR CLEANING OF VESSELS
|
0 |
$0 |
0.0 |
|
3.7114
|
|
USE SQUEEGEES TO RECOVER CLINGING PRODUCT PRIOR TO RINSING
|
0 |
$0 |
0.0 |
|
3.7115
|
|
CLEAN LINES WITH "PIGS" INSTEAD OF SOLVENTS / SOLUTIONS
|
0 |
$0 |
0.0 |
|
|
3.712x
|
 |
Reduction of Cleaning
|
1 |
$2,500 |
0.0 |
|
3.7121
|
|
IMPROVE HANDLING PRACTICES
|
0 |
$0 |
0.0 |
|
3.7122
|
|
MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING
|
0 |
$0 |
0.0 |
|
3.7123
|
|
USE CONTINUOUS PROCESSING
|
1 |
$2,500 |
0.0 |
|
3.7124
|
|
INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING
|
0 |
$0 |
0.0 |
|
3.7125
|
|
SHORTEN PAINT LINES AS MUCH AS POSSIBLE
|
0 |
$0 |
0.0 |
|
3.7126
|
|
USE PEEL COATINGS ON RAW MATERIALS
|
0 |
$0 |
0.0 |
|
3.7127
|
|
MINIMIZE PART CONTAMINATION BEFORE WASHING
|
0 |
$0 |
0.0 |
|
|
3.713x
|
 |
Rag Use
|
3 |
$29,310 |
0.0 |
|
3.7131
|
|
USE A RAG RECYCLE SERVICE
|
0 |
$0 |
0.0 |
|
3.7132
|
|
REUSE RAGS UNTIL COMPLETELY SOILED
|
3 |
$29,310 |
0.0 |
|
3.7133
|
|
USE RAGS SIZED FOR EACH JOB
|
0 |
$0 |
0.0 |
|
3.7134
|
|
WASH AND REUSE RAGS ON-SITE
|
0 |
$0 |
0.0 |
|
3.7135
|
|
MINIMIZE USE OF RAGS THROUGH WORKER TRAINING
|
0 |
$0 |
0.0 |
|
3.7136
|
|
MARKET WASTE MATERIALS AS CLEAN-UP RAGS
|
0 |
$0 |
0.0 |
|
3.7137
|
|
REPLACE CLOTH RAGS WITH PAPER TOWELS
|
0 |
$0 |
0.0 |
|
|
3.714x
|
 |
Preventive Maintenance
|
0 |
$0 |
0.0 |
|
3.7141
|
|
IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM
|
0 |
$0 |
0.0 |
|
3.7142
|
|
USE CLEAN IN PLACE (CIP) SYSTEMS
|
0 |
$0 |
0.0 |
|
3.7143
|
|
CLEAN EQUIPMENT IMMEDIATELY AFTER USE
|
0 |
$0 |
0.0 |
|
|
3.719x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
3.7191
|
|
USE WATER BASED SPRAY ABRASIVES INSTEAD OF BAR ABRASIVES
|
0 |
$0 |
0.0 |
|
3.7192
|
|
USE DRY CLEANING METHODS WHENEVER POSSIBLE
|
0 |
$0 |
0.0 |
|
3.7193
|
|
USE HIGH PRESSURE WASH SYSTEMS
|
0 |
$0 |
0.0 |
|
3.7194
|
|
USE DISPOSABLE LINERS IN TANKS
|
0 |
$0 |
0.0 |
|
3.7195
|
|
USE TEFLON LINED TANKS
|
0 |
$0 |
0.0 |
|
3.7196
|
|
USE RE-USABLE FILTERS
|
0 |
$0 |
0.0 |
|
3.7197
|
|
USE ULTRASONIC CLEANING
|
0 |
$0 |
0.0 |
|
3.7198
|
|
REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT
|
0 |
$0 |
0.0 |
|
|
|
3.72xx
|
 |
Spillage
|
1 |
$1,365 |
1.4 |
|
3.721x
|
 |
Operations
|
1 |
$1,365 |
1.4 |
|
3.7211
|
|
MODIFY MATERIAL APPLICATION METHODS
|
0 |
$0 |
0.0 |
|
3.7212
|
|
IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER)
|
0 |
$0 |
0.0 |
|
3.7213
|
|
USE MORE EFFICIENT SPRAY METHOD FOR GELCOAT APPLICATION
|
0 |
$0 |
0.0 |
|
3.7214
|
|
REDUCE OR ELIMINATE WASTE
|
1 |
$1,365 |
1.4 |
|
3.7215
|
|
AVOID INSERTING OVERSIZED OBJECT TO REDUCE PISTON EFFECT
|
0 |
$0 |
0.0 |
|
|
3.722x
|
 |
Hardware
|
0 |
$0 |
0.0 |
|
3.7221
|
|
IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL
|
0 |
$0 |
0.0 |
|
3.7222
|
|
MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS
|
0 |
$0 |
0.0 |
|
3.7223
|
|
INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING
|
0 |
$0 |
0.0 |
|
3.7224
|
|
USE PUMPS AND PIPING TO DECREASE THE FREQUENCY OF SPILLAGE DURING MATERIAL TRANSFER
|
0 |
$0 |
0.0 |
|
|
|
3.73xx
|
 |
Other
|
0 |
$0 |
0.0 |
|
3.731x
|
 |
Leak Reduction
|
0 |
$0 |
0.0 |
|
3.7311
|
|
MAINTAIN MACHINES WITH TO REDUCE LEAKS
|
0 |
$0 |
0.0 |
|
3.7312
|
|
IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS
|
0 |
$0 |
0.0 |
|
3.7313
|
|
ELIMINATE OXYGEN LOSS
|
0 |
$0 |
0.0 |
|
|
3.739x
|
 |
Miscellaneous
|
0 |
$0 |
0.0 |
|
3.7391
|
|
IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION
|
0 |
$0 |
0.0 |
|
3.7392
|
|
APPLY A PROTECTIVE COATING TO RACKS AND TANKS
|
0 |
$0 |
0.0 |
|
3.7393
|
|
IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION
|
0 |
$0 |
0.0 |
|
|
|
|
3.8xxx
|
 |
Raw Materials
|
1 |
$28,070 |
0.7 |
|
3.81xx
|
 |
Solvents
|
1 |
$28,070 |
0.7 |
|
3.811x
|
 |
Use Reduction
|
0 |
$0 |
0.0 |
|
3.8111
|
|
MAINTAIN WATER SEPARATOR AND COMPLETELY DRY PARTS TO AVOID WATER CONTAMINATION OF SOLVENT
|
0 |
$0 |
0.0 |
|
3.8112
|
|
USE DEIONIZED WATER FOR MAKE-UP AND RINSE WATER TO INCREASE SOLUTION LIFE
|
0 |
$0 |
0.0 |
|
3.8113
|
|
PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING)
|
0 |
$0 |
0.0 |
|
3.8114
|
|
AUTOMATE PAINT MIXING-USE COMPRESSED AIR BLOWOUT FOR LINE CLEANING PRIOR TO SOLVENT CLEANING
|
0 |
$0 |
0.0 |
|
3.8115
|
|
REDUCE THE NUMBER OF PARTS WASHERS
|
0 |
$0 |
0.0 |
|
|
3.812x
|
 |
Emission Reduction
|
0 |
$0 |
0.0 |
|
3.8121
|
|
COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES
|
0 |
$0 |
0.0 |
|
3.8122
|
|
USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS
|
0 |
$0 |
0.0 |
|
3.8124
|
|
INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION
|
0 |
$0 |
0.0 |
|
3.8125
|
|
REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER
|
0 |
$0 |
0.0 |
|
3.8126
|
|
USE FLUE GAS RECUPERATION TO REDUCE VOC
|
0 |
$0 |
0.0 |
|
|
3.813x
|
 |
Material Replacement
|
1 |
$28,070 |
0.7 |
|
3.8131
|
|
USE WATER-BASED ADHESIVES
|
0 |
$0 |
0.0 |
|
3.8132
|
|
USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES
|
0 |
$0 |
0.0 |
|
3.8133
|
|
CONVERT TO AQUEOUS CLEANING
|
0 |
$0 |
0.0 |
|
3.8134
|
|
USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING
|
0 |
$0 |
0.0 |
|
3.8135
|
|
USE LOW VOC OR WATER BASED PAINT
|
0 |
$0 |
0.0 |
|
3.8136
|
|
SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED
|
0 |
$0 |
0.0 |
|
3.8137
|
|
USE SOY OR WATER-BASED INKS
|
1 |
$28,070 |
0.7 |
|
|
3.814x
|
 |
Solvent Recovery
|
0 |
$0 |
0.0 |
|
3.8141
|
|
REGENERATE CLEANING SOLVENT ON-SITE AND REUSE
|
0 |
$0 |
0.0 |
|
3.8142
|
|
DISTILL CONTAMINATED SOLVENTS FOR REUSE
|
0 |
$0 |
0.0 |
|
3.8143
|
|
RECYCLE CLEANING SOLVENT AND REUSE
|
0 |
$0 |
0.0 |
|
|
|
3.82xx
|
 |
Other Solutions
|
0 |
$0 |
0.0 |
|
3.821x
|
 |
Water-Based Substitutes
|
0 |
$0 |
0.0 |
|
3.8211
|
|
CONVERT TO AQUEOUS CLEANING SYSTEM
|
0 |
$0 |
0.0 |
|
3.8212
|
|
USE WATER-BASED IMAGE PROCESSING CHEMICALS
|
0 |
$0 |
0.0 |
|
3.8213
|
|
USE WATER BASED OR GREASELESS BINDERS TO INCREASE WHEEL LIFE
|
0 |
$0 |
0.0 |
|
3.8214
|
|
USE WATER-BASED DEVELOPERS AND FINISHERS
|
0 |
$0 |
0.0 |
|
|
3.822x
|
 |
Other Substitutes
|
0 |
$0 |
0.0 |
|
3.8221
|
|
USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE)
|
0 |
$0 |
0.0 |
|
3.8222
|
|
USE REACTIVE RINSING TO EXTEND BATH LIFE
|
0 |
$0 |
0.0 |
|
3.8223
|
|
USE NON-PHENOLIC STRIPPERS TO REDUCE TOXICITY ASSOCIATED WITH PHENOL AND ACID ADDITIVES
|
0 |
$0 |
0.0 |
|
3.8224
|
|
CONVERT TO LESS TOXIC HYDROCARBON CLEANERS
|
0 |
$0 |
0.0 |
|
3.8225
|
|
REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS
|
0 |
$0 |
0.0 |
|
3.8226
|
|
USE CYANIDE FREE SOLUTIONS WHENEVER POSSIBLE
|
0 |
$0 |
0.0 |
|
3.8227
|
|
REPLACE CADMIUM-BASED SOLUTIONS WITH ZINC SOLUTIONS
|
0 |
$0 |
0.0 |
|
3.8228
|
|
REPLACE HEAVY METAL REAGENTS WITH NON-HAZARDOUS REAGENTS
|
0 |
$0 |
0.0 |
|
|
|
3.83xx
|
 |
Solids
|
0 |
$0 |
0.0 |
|
3.831x
|
 |
General
|
0 |
$0 |
0.0 |
|
3.8311
|
|
USE SILVER FREE FILMS
|
0 |
$0 |
0.0 |
|
3.8312
|
|
USE BUILDING MATERIALS WHICH REQUIRE LESS ENERGY TO PRODUCE
|
0 |
$0 |
0.0 |
|
3.8313
|
|
ALTER RAW MATERIALS TO REDUCE AIR EMISSIONS
|
0 |
$0 |
0.0 |
|
3.8314
|
|
PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS
|
0 |
$0 |
0.0 |
|
|
|
|
|
4.xxxx
|
 |
DIRECT PRODUCTIVITY ENHANCEMENTS
|
34 |
$179,872 |
0.8 |
|
4.1xxx
|
 |
MANUFACTURING ENHANCEMENTS
|
8 |
$61,918 |
0.5 |
|
4.11xx
|
 |
Bottleneck Reduction
|
3 |
$8,936 |
1.0 |
|
4.111x
|
 |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK
|
4 |
$11,952 |
0.8 |
|
4.112x
|
 |
REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL
|
0 |
$0 |
0.0 |
|
4.113x
|
 |
INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT
|
0 |
$0 |
0.0 |
|
4.114x
|
 |
ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS
|
0 |
$0 |
0.0 |
|
|
4.12xx
|
 |
Defect Reduction
|
2 |
$113,100 |
0.0 |
|
4.121x
|
 |
MAINTAIN CLEAN CONDITIONS BEFORE PAINTING
|
0 |
$0 |
0.0 |
|
4.122x
|
 |
DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS
|
1 |
$225,000 |
0.1 |
|
4.123x
|
 |
REDUCE DEFECTS BY REDUCING PRODUCT TIPPING
|
0 |
$0 |
0.0 |
|
4.124x
|
 |
INSTALL CONTINUOUS LUBRICATION EQUIPMENT
|
0 |
$0 |
0.0 |
|
4.125x
|
 |
MODIFY PROCESS TO REDUCE MATERIAL COSTS
|
1 |
$1,200 |
0.0 |
|
4.126x
|
 |
INSTALL SENSORS TO DETECT DEFECTS
|
0 |
$0 |
0.0 |
|
|
4.13xx
|
 |
Material Reduction
|
3 |
$80,777 |
0.4 |
|
4.131x
|
 |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST
|
1 |
$7,150 |
0.1 |
|
4.132x
|
 |
PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST
|
2 |
$117,591 |
0.5 |
|
|
|
4.2xxx
|
 |
Purchasing
|
1 |
$21,040 |
0.1 |
|
4.21xx
|
 |
Raw Materials
|
1 |
$21,040 |
0.1 |
|
4.211x
|
 |
CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE
|
0 |
$0 |
0.0 |
|
4.212x
|
 |
ADOPT IN-HOUSE MATERIAL GENERATION
|
1 |
|
|
|
|
|
|