


2007 Energy Champions announced ![]()
October 26, 2007
2007 Save Energy Now Recognition Awards announced ![]()
October 26, 2007
| Assessment Date | 06/17/2005 |
| SIC | 3479 |
| SIC Description | Metal Coating And Allied Services |
| NAICS | 332812 |
| NAICS Decription | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| Principal Product | Metal Plated Products |
| Sales | $3,800,000 |
| # of Employees | 52 |
| Plant Area (Sq.Ft.) | 69,500 |
| Annual Production | 18,000,000 Pieces |
| Production Hrs. Annual | 2,860 |
| Location (State | OH |
| Fiscal Year (Budget Year) | 2005 |
| Yearly Energy Cost | $305,253 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
Electricity |
1,550,797 KWh | $54,721 | $0.035 |
- Demand Charge |
6,315KW-Month/Year | $69,284 | $10.97 |
- Electricity Fees |
- | $2,407 | - |
Natural Gas |
25,088 MMBtu | $178,841 | $7.13 |
| Energy Sources | Yearly Usage | Yearly Cost | % Saved | Unit Price |
Electricity |
185,915 KWh | $6,554 | 12% | $0.035 |
- Demand Charge |
750 KW-Month/Year | $8,224 | 12% | $0.035 |
- Electricity Fees |
0 KWh | $0 | 0% | $0.035 |
Natural Gas |
2,037 MMBtu | $14,523 | 8% | $7.13 |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
||||||||||||||||
| 1 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $1,797 | $6,011 | 0.3 | |||||||||||||||
|
||||||||||||||||||||||
| 2 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $14,339 | $5,897 | 2.4 | |||||||||||||||
|
||||||||||||||||||||||
| 3 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $1,840 | $5,386 | 0.3 | |||||||||||||||
|
||||||||||||||||||||||
| 4 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $2,722 | $4,621 | 0.6 | |||||||||||||||
|
||||||||||||||||||||||
| 5 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $1,000 | $2,818 | 0.4 | |||||||||||||||
|
||||||||||||||||||||||
| 6 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $3,517 | $1,047 | 3.4 | |||||||||||||||
|
||||||||||||||||||||||
| 7 | view details |
USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | 2.2426 | I | $1,076 | $780 | 1.4 | |||||||||||||||
|
||||||||||||||||||||||
| 8 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | I | $367 | $652 | 0.6 | |||||||||||||||
|
||||||||||||||||||||||
| 9 | view details |
USE SYNTHETIC LUBRICANT | 2.4314 | I | $17 | $577 | 0.0 | |||||||||||||||
|
||||||||||||||||||||||
| 10 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $54 | $459 | 0.1 | |||||||||||||||
|
||||||||||||||||||||||
| 11 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $140 | $388 | 0.4 | |||||||||||||||
|
||||||||||||||||||||||
| 12 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $180 | $295 | 0.6 | |||||||||||||||
|
||||||||||||||||||||||
Rutgers CAES | Industrial Technologies Program Home |
EERE Home
U.S. Department of Energy
| Webmaster |
USA.gov
Content Last Updated: 11/13/2007