Industrial Assessment Centers
Assessment #WV0448
| Assessment Year | 2012 |
|---|---|
| SIC | 2819 |
| SIC Description | Industrial Inorganic Chemicals, Nec |
| NAICS | 325998 |
| NAICS Description | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| Principal Product | plastic bottles and technology assistance |
| Sales | $ 30,000,000 |
| # of Employees | 68 |
| Plant Area (Sq.Ft.) | 43,000 |
| Annual Production | 100 Tons |
| Production Hrs. Annual | 6,240 |
| Location (State) | OH |
| Yearly Energy Cost | $ 163,043 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,205,040 kWh | $ 105,697 | $ 0.088 /kWh |
- Demand Charge |
4,901 kW | $ 31,047 | $ 6.33 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
3,688 MMBtu | $ 26,299 | $ 7.13 /MMBtu |
TOTAL ENERGY |
16,040 MMBtu | $ 163,043 | $ 10.16 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
147,577 kWh 87,259 kWh |
$ 12,944 $ 7,654 |
12.25 % 7.24 % |
$ 0.088 /kWh |
- Demand Charge |
304 kW 200 kW |
$ 1,930 $ 1,270 |
6.22 % 4.09 % |
$ 6.33 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,346 MMBtu 0 MMBtu |
$ 9,597 $ 0 |
36.49 % 0.00 % |
$ 7.13 /MMBtu |
TOTAL ENERGY |
2,859 MMBtu 894 MMBtu |
$ 24,471 $ 8,924 |
15.01 % 5.47 % |
$ 10.16 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 9,258 | $ 5,725 | 1.62 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | 2.7492 | N | $ 51,600 | $ 5,053 | 10.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | 2.7232 | N | $ 16,925 | $ 3,859 | 4.39 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | 2.2492 | N | $ 14,500 | $ 3,243 | 4.47 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 1,826 | $ 1,979 | 0.92 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 10,438 | $ 1,968 | 5.30 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 5,689 | $ 1,424 | 4.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 1,000 | $ 1,103 | 0.91 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 7 | $ 117 | 0.06 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||