Industrial Assessment Centers
Assessment #WV0446
| Assessment Year | 2012 |
|---|---|
| SIC | 2087 |
| SIC Description | Flavoring Extracts And Syrups, Nec |
| NAICS | 311930 |
| NAICS Description | Flavoring Syrup and Concentrate Manufacturing |
| Principal Product | Flavors |
| Sales | $ 100,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 110,000 |
| Annual Production | 10,000,000 Pounds |
| Production Hrs. Annual | 8,568 |
| Location (State) | MD |
| Yearly Energy Cost | $ 1,384,978 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
9,659,300 kWh | $ 924,720 | $ 0.096 /kWh |
- Demand Charge |
19,071 kW | $ 45,961 | $ 2.41 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
59,431 MMBtu | $ 414,297 | $ 6.97 /MMBtu |
TOTAL ENERGY |
158,440 MMBtu | $ 1,384,978 | $ 8.74 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
3,026,333 kWh 324,517 kWh |
$ 289,676 $ 31,067 |
31.33 % 3.36 % |
$ 0.096 /kWh |
- Demand Charge |
4,939 kW 454 kW |
$ 11,903 $ 1,094 |
25.90 % 2.38 % |
$ 2.41 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
-3,966 MMBtu 1,614 MMBtu |
$ -27,642 $ 11,250 |
-6.67 % 2.72 % |
$ 6.97 /MMBtu |
TOTAL ENERGY |
27,054 MMBtu 4,940 MMBtu |
$ 273,937 $ 43,411 |
19.78 % 3.13 % |
$ 8.74 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | 2.3413 | N | $ 548,000 | $ 147,469 | 3.72 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 70,000 | $ 21,144 | 3.31 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 21,000 | $ 20,208 | 1.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | 2.4156 | I | $ 1,000 | $ 16,273 | 0.06 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
IMPROVE LUBRICATION PRACTICES | 2.4312 | N | $ 2,034 | $ 10,748 | 0.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | 2.1221 | N | $ 9,500 | $ 9,842 | 0.97 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 32,125 | $ 8,197 | 3.92 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 2,500 | $ 6,963 | 0.36 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 5,683 | $ 6,712 | 0.85 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 423 | $ 6,393 | 0.07 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
REPAIR OR REPLACE STEAM TRAPS | 2.2113 | I | $ 4,438 | $ 3,610 | 1.23 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 1,070 | $ 2,862 | 0.37 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 13 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,351 | $ 2,788 | 0.48 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 14 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 5,700 | $ 2,403 | 2.37 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 15 | view details |
CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | 2.2625 | I | $ 70 | $ 2,151 | 0.03 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 16 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 1,625 | $ 1,334 | 1.22 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 17 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 475 | $ 1,153 | 0.41 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||