| Assessment Year | 2012 |
|---|---|
| SIC | 3089 |
| SIC Description | Plastics Products, Nec |
| NAICS | 326199 |
| NAICS Description | All Other Plastics Product Manufacturing |
| Principal Product | Automobile Plastic Parts |
| Sales | $ 120,000,000 |
| # of Employees | 565 |
| Plant Area (Sq.Ft.) | 425,000 |
| Annual Production | 120,000,000 Pounds |
| Production Hrs. Annual | 8,064 |
| Location (State) | OH |
| Yearly Energy Cost | $ 3,380,075 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
31,608,216 kWh | $ 1,996,901 | $ 0.063 /kWh |
- Demand Charge |
63,092 kW | $ 504,774 | $ 8.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
148,210 MMBtu | $ 878,400 | $ 5.93 /MMBtu |
TOTAL ENERGY |
472,197 MMBtu | $ 3,380,075 | $ 7.16 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
5,309,567 kWh 1,949,302 kWh |
$ 335,458 $ 123,157 |
16.80 % 6.17 % |
$ 0.063 /kWh |
- Demand Charge |
7,841 kW 2,903 kW |
$ 62,568 $ 23,064 |
12.40 % 4.57 % |
$ 8.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
9,567 MMBtu 1,583 MMBtu |
$ 56,732 $ 9,387 |
6.46 % 1.07 % |
$ 5.93 /MMBtu |
TOTAL ENERGY |
63,991 MMBtu 21,564 MMBtu |
$ 454,758 $ 155,608 |
13.45 % 4.60 % |
$ 7.16 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 102,956 | $ 186,348 | 0.55 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 160,057 | $ 59,316 | 2.70 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | 2.4157 | I | $ 6,000 | $ 39,551 | 0.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 32,050 | $ 30,777 | 1.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 5,551 | $ 25,750 | 0.22 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | 2.2426 | N | $ 43,600 | $ 22,024 | 1.98 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 34,000 | $ 16,138 | 2.11 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 31,450 | $ 13,230 | 2.38 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 40,725 | $ 9,998 | 4.07 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,000 | $ 9,620 | 0.21 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | 2.7241 | N | $ 10,700 | $ 6,831 | 1.57 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 5,175 | $ 6,825 | 0.76 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 13 | view details |
REPAIR OR REPLACE STEAM TRAPS | 2.2113 | I | $ 6,738 | $ 5,366 | 1.26 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 14 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 998 | $ 5,361 | 0.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 15 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 1,000 | $ 5,236 | 0.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 16 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 6,840 | $ 2,093 | 3.27 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 17 | view details |
IMPROVE LUBRICATION PRACTICES | 2.4312 | N | $ 1,255 | $ 2,091 | 0.60 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 18 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 4,020 | $ 1,749 | 2.30 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 19 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 2,500 | $ 1,224 | 2.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 20 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 1,058 | $ 744 | 1.42 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||