Assessment #WV0428
| Assessment Year | 2011 |
|---|---|
| SIC | 3431 |
| SIC Description | Metal Sanitary Ware |
| NAICS | 332312 |
| NAICS Description | Fabricated Structural Metal Manufacturing |
| Principal Product | Nickel products and Extruded tubes |
| Sales | $ 30,000,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 200,000 |
| Annual Production | 44,100,000 Pounds |
| Production Hrs. Annual | 7,200 |
| Location (State) | KY |
| Yearly Energy Cost | $ 4,316,761 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
52,368,000 kWh | $ 1,521,814 | $ 0.029 /kWh |
- Demand Charge |
128,616 kW | $ 1,707,695 | $ 13.28 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
180,477 MMBtu | $ 1,087,252 | $ 6.02 /MMBtu |
TOTAL ENERGY |
717,254 MMBtu | $ 4,316,761 | $ 6.02 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,971,598 kWh 1,366,815 kWh |
$ 84,780 $ 38,996 |
5.57 % 2.56 % |
$ 0.029 /kWh |
- Demand Charge |
4,877 kW 2,277 kW |
$ 65,144 $ 29,984 |
3.81 % 1.76 % |
$ 13.28 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
17,042 MMBtu 2,303 MMBtu |
$ 102,540 $ 13,865 |
9.43 % 1.28 % |
$ 6.02 /MMBtu |
TOTAL ENERGY |
47,501 MMBtu 16,313 MMBtu |
$ 252,464 $ 82,845 |
5.85 % 1.92 % |
$ 6.02 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 209,000 | $ 74,991 | 2.79 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 80,800 | $ 45,746 | 1.77 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 60,550 | $ 40,236 | 1.50 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 24,000 | $ 12,157 | 1.97 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 815 | $ 11,317 | 0.07 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,000 | $ 9,763 | 0.10 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 9,060 | $ 8,107 | 1.12 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 8,550 | $ 8,061 | 1.06 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | 2.4157 | I | $ 2,000 | $ 7,253 | 0.28 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 700 | $ 7,120 | 0.10 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 1,890 | $ 5,623 | 0.34 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 3,010 | $ 5,254 | 0.57 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 13 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 0 | $ 4,404 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 14 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 600 | $ 4,082 | 0.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 15 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 25 | $ 2,154 | 0.01 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 16 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 3,000 | $ 2,125 | 1.41 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 17 | view details |
REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | 2.4235 | N | $ 0 | $ 860 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 18 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 770 | $ 391 | 1.97 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||