| Assessment Year | 2010 |
|---|---|
| SIC | 2899 |
| SIC Description | Chemical Preparations, Nec |
| NAICS | 325188 |
| NAICS Description | All Other Basic Inorganic Chemical Manufacturing |
| Principal Product | Chemical Polymers and Blends |
| Sales | $ 260,000,000 |
| # of Employees | 176 |
| Plant Area (Sq.Ft.) | 368,650 |
| Annual Production | 20,000,000 Pounds |
| Production Hrs. Annual | 6,240 |
| Location (State) | PA |
| Yearly Energy Cost | $ 693,245 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
6,833,122 kWh | $ 543,841 | $ 0.080 /kWh |
- Demand Charge |
17,388 kW | $ 29,690 | $ 1.71 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
32,113 MMBtu | $ 119,714 | $ 3.73 /MMBtu |
TOTAL ENERGY |
102,153 MMBtu | $ 693,245 | $ 6.79 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,213,390 kWh 1,055,378 kWh |
$ 96,574 $ 83,998 |
17.76 % 15.45 % |
$ 0.080 /kWh |
- Demand Charge |
2,444 kW 2,140 kW |
$ 4,180 $ 3,660 |
14.08 % 12.33 % |
$ 1.71 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,880 MMBtu 0 MMBtu |
$ 10,742 $ 0 |
8.97 % 0.00 % |
$ 3.73 /MMBtu |
TOTAL ENERGY |
15,317 MMBtu 10,818 MMBtu |
$ 111,496 $ 87,658 |
16.08 % 12.64 % |
$ 6.79 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | I | $ 55,000 | $ 45,685 | 1.20 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 52,453 | $ 18,050 | 2.91 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 70,410 | $ 18,231 | 3.86 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
IMPROVE LUBRICATION PRACTICES | 2.4312 | N | $ 5,823 | $ 9,486 | 0.61 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 20,500 | $ 4,543 | 4.51 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 8,756 | $ 3,610 | 2.43 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | 2.7313 | N | $ 8,600 | $ 2,357 | 3.65 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 10,700 | $ 2,342 | 4.57 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,620 | $ 2,274 | 0.71 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 110 | $ 2,238 | 0.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 748 | $ 1,180 | 0.63 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||