Industrial Assessment Centers
Assessment #WV0386
| Assessment Year | 2008 |
|---|---|
| SIC | 2426 |
| SIC Description | Hardwood Dimension & Flooring Mills |
| NAICS | 321918 |
| NAICS Description | Other Millwork (including Flooring) |
| Principal Product | Hardwood Flooring |
| Sales | $ 14,000,000 |
| # of Employees | 31 |
| Plant Area (Sq.Ft.) | 45,000 |
| Annual Production | 2,500 Thousand Feet |
| Production Hrs. Annual | 2,184 |
| Location (State) | PA |
| Yearly Energy Cost | $ 263,894 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,430,536 kWh | $ 78,853 | $ 0.055 /kWh |
- Demand Charge |
7,430 kW | $ 51,958 | $ 6.99 /kW |
- Electricity Fees |
- | $ 1,003 | - |
Fuel Oil #2 |
6,222 MMBtu | $ 132,080 | $ 21.23 /MMBtu |
TOTAL ENERGY |
20,885 MMBtu | $ 263,894 | $ 12.64 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-135,165 kWh -34,122 kWh |
$ -13,705 $ -8,135 |
-17.38 % -10.32 % |
$ 0.055 /kWh |
- Demand Charge |
99 kW 654 kW |
$ 690 $ 4,569 |
1.33 % 8.79 % |
$ 6.99 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #2 |
8,565 MMBtu 6,545 MMBtu |
$ 225,592 $ 172,386 |
170.80 % 130.52 % |
$ 21.23 /MMBtu |
TOTAL ENERGY |
688 MMBtu -296 MMBtu |
$ 211,894 $ 168,137 |
80.30 % 63.71 % |
$ 12.64 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | 2.1336 | I | $ 517,666 | $ 140,425 | 3.69 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 8,525 | $ 16,673 | 0.51 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 8,450 | $ 15,988 | 0.53 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | 2.2426 | N | $ 8,100 | $ 7,586 | 1.07 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 920 | $ 4,653 | 0.20 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 7,700 | $ 3,371 | 2.28 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 769 | $ 2,823 | 0.27 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 0 | $ 2,790 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 396 | $ 2,379 | 0.17 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 10 | view details |
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | 2.4157 | I | $ 1,000 | $ 1,621 | 0.62 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 11 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 50 | $ 1,548 | 0.03 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 12 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,000 | $ 884 | 1.13 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 13 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 0 | $ 139 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||