| Assessment Year | 2008 |
|---|---|
| SIC | 3545 |
| SIC Description | Machine Tool Accessories |
| NAICS | 332212 |
| NAICS Description | Hand and Edge Tool Manufacturing |
| Principal Product | Cutting Tools |
| Sales | $ 20,000,000 |
| # of Employees | 250 |
| Plant Area (Sq.Ft.) | 74,000 |
| Annual Production | 1,820,000 Pieces |
| Production Hrs. Annual | 8,712 |
| Location (State) | OH |
| Yearly Energy Cost | $ 811,264 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
10,379,000 kWh | $ 804,089 | $ 0.077 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
3,181 MMBtu | $ 7,175 | $ 2.26 /MMBtu |
TOTAL ENERGY |
109,566 MMBtu | $ 811,264 | $ 7.40 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
974,280 kWh 851,068 kWh |
$ 81,039 $ 65,932 |
10.08 % 8.20 % |
$ 0.077 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,404 MMBtu 0 MMBtu |
$ 3,173 $ 0 |
44.22 % 0.00 % |
$ 2.26 /MMBtu |
TOTAL ENERGY |
11,389 MMBtu 8,723 MMBtu |
$ 84,212 $ 65,932 |
10.38 % 8.13 % |
$ 7.40 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 12,730 | $ 25,144 | 0.51 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 2,213 | $ 15,831 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | 2.4157 | I | $ 4,500 | $ 7,994 | 0.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 1,076 | $ 7,339 | 0.15 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
USE POWER FACTOR CONTROLLERS | 2.3211 | N | $ 11,346 | $ 5,562 | 2.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 6,378 | $ 5,079 | 1.26 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 612 | $ 4,440 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 315 | $ 3,513 | 0.09 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 9,054 | $ 3,039 | 2.98 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 440 | $ 2,784 | 0.16 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | N | $ 1,884 | $ 1,750 | 1.08 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 690 | $ 389 | 1.77 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||