Assessment #WV0352
| Assessment Year | 2006 |
|---|---|
| SIC | 2759 |
| SIC Description | Commercial Printing, Nec |
| NAICS | 323119 |
| NAICS Description | Other Commercial Printing |
| Principal Product | Commercial Printing |
| Sales | $ 13,000,000 |
| # of Employees | 55 |
| Plant Area (Sq.Ft.) | 55,000 |
| Annual Production | 6,000,000 Pieces |
| Production Hrs. Annual | 6,240 |
| Location (State) | MD |
| Yearly Energy Cost | $ 187,506 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,662,228 kWh | $ 167,646 | $ 0.101 /kWh |
- Electricity Fees |
- | $ 2,349 | - |
Natural Gas |
989 MMBtu | $ 17,511 | $ 17.71 /MMBtu |
TOTAL ENERGY |
18,027 MMBtu | $ 187,506 | $ 10.40 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
251,032 kWh 142,852 kWh |
$ 25,295 $ 14,392 |
15.09 % 8.58 % |
$ 0.101 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
13 MMBtu 0 MMBtu |
$ 224 $ 0 |
1.28 % 0.00 % |
$ 17.71 /MMBtu |
TOTAL ENERGY |
2,584 MMBtu 1,463 MMBtu |
$ 25,519 $ 14,392 |
13.61 % 7.68 % |
$ 10.40 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 170 | $ 7,713 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 15,353 | $ 7,003 | 2.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | 2.7228 | I | $ 3,440 | $ 1,862 | 1.85 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
DISCONNECT BALLASTS | 2.7122 | I | $ 1,500 | $ 1,803 | 0.83 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,431 | $ 1,773 | 0.81 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,335 | $ 1,241 | 1.08 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 25 | $ 857 | 0.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 700 | $ 857 | 0.82 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 13 | $ 702 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | N | $ 325 | $ 473 | 0.69 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
INSTALL AIR SEALS AROUND TRUCK LOADING DOCK DOORS | 2.7443 | N | $ 735 | $ 460 | 1.60 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | 2.2625 | N | $ 38 | $ 325 | 0.12 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||