Assessment #WI0253
| Assessment Year | 1995 |
|---|---|
| SIC | 3844 |
| SIC Description | X-ray Apparatus And Tubes |
| NAICS | |
| NAICS Description | |
| Principal Product | X-Ray Tubes |
| Sales | $ 30,000,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 300,000 |
| Annual Production | 6,000 Pieces |
| Production Hrs. Annual | 4,250 |
| Location (State) | IL |
| Yearly Energy Cost | $ 357,174 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,973,916 kWh | $ 307,587 | $ 0.062 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
17,663 MMBtu | $ 49,587 | $ 2.81 /MMBtu |
TOTAL ENERGY |
68,646 MMBtu | $ 357,174 | $ 5.20 /MMBtu |
Solid Waste (non-haz) |
100,000 lbs | $ 7,600 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
216,588 kWh 0 kWh |
$ 14,243 $ 0 |
4.63 % 0.00 % |
$ 0.062 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,231 MMBtu 0 MMBtu |
$ 5,268 $ 0 |
10.62 % 0.00 % |
$ 2.81 /MMBtu |
TOTAL ENERGY |
4,451 MMBtu 0 MMBtu |
$ 19,511 $ 0 |
5.46 % 0.00 % |
$ 5.20 /MMBtu |
Solid Waste (non-haz) |
60,000 lbs 0 lbs |
$ 2,860 $ 0 |
37.63 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | K | $ 0 | $ 6,770 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | K | $ 7,683 | $ 3,306 | 2.32 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | K | $ 0 | $ 2,174 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | K | $ 7,000 | $ 2,365 | 2.96 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | K | $ 2,000 | $ 2,029 | 0.99 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | 2.3415 | K | $ 0 | $ 1,958 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | K | $ 960 | $ 540 | 1.78 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | K | $ 49 | $ 369 | 0.13 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | 3.6193 | K | $ 0 | $ 2,860 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||