Industrial Assessment Centers
Assessment #UU0057
| Assessment Year | 2004 |
|---|---|
| SIC | 2024 |
| SIC Description | Ice Cream And Frozen Desserts |
| NAICS | 313520 |
| NAICS Description | |
| Principal Product | ice cream |
| Sales | $ 18,000,000 |
| # of Employees | 170 |
| Plant Area (Sq.Ft.) | 48,000 |
| Annual Production | 2,125 Thousand Gallons |
| Production Hrs. Annual | 2,080 |
| Location (State) | UT |
| Yearly Energy Cost | $ 224,729 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,326,880 kWh | $ 92,278 | $ 0.028 /kWh |
- Demand Charge |
10,274 kW | $ 83,219 | $ 8.10 /kW |
- Electricity Fees |
- | $ 15,852 | - |
Natural Gas |
7,940 MMBtu | $ 33,380 | $ 4.20 /MMBtu |
TOTAL ENERGY |
42,041 MMBtu | $ 224,729 | $ 5.35 /MMBtu |
Water Disposal |
9,473,000 Gal | $ 41,876 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
28,489 kWh 14,770 kWh |
$ 859 $ 446 |
0.93 % 0.48 % |
$ 0.028 /kWh |
- Demand Charge |
835 kW 756 kW |
$ 7,359 $ 6,664 |
8.84 % 8.01 % |
$ 8.10 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
3,296 MMBtu 0 MMBtu |
$ 13,531 $ 0 |
40.54 % 0.00 % |
$ 4.20 /MMBtu |
TOTAL ENERGY |
3,587 MMBtu 151 MMBtu |
$ 21,749 $ 7,110 |
9.68 % 3.16 % |
$ 5.35 /MMBtu |
Water Disposal |
7,105,000 Gal 0 Gal |
$ 25,812 $ 0 |
61.64 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 100 | $ 792 | 0.13 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 20 | $ 829 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 129 | $ 279 | 0.46 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 6,450 | $ 2,240 | 2.88 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INCREASE AMOUNT OF CONDENSATE RETURNED | 2.2121 | N | $ 25,000 | $ 4,493 | 5.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | N | $ 2,000 | $ 4,110 | 0.49 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INSTALL TURBULATORS | 2.1222 | N | $ 1,747 | $ 1,680 | 1.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 809 | $ 1,320 | 0.61 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | I | $ 0 | $ 5,920 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | 2.7124 | I | $ 20 | $ 398 | 0.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | 3.3132 | N | $ 192,450 | $ 25,500 | 7.55 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||