Industrial Assessment Centers
Assessment #UU0043
| Assessment Year | 2003 |
|---|---|
| SIC | 2899 |
| SIC Description | Chemical Preparations, Nec |
| NAICS | 325998 |
| NAICS Description | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| Principal Product | salt |
| Sales | $ 0 |
| # of Employees | 141 |
| Plant Area (Sq.Ft.) | 75,000 |
| Annual Production | 600,000 Tons |
| Production Hrs. Annual | 8,760 |
| Location (State) | UT |
| Yearly Energy Cost | $ 740,314 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
12,490,820 kWh | $ 346,458 | $ 0.028 /kWh |
- Demand Charge |
278,436 kW | $ 191,395 | $ 0.69 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
168,129 MMBtu | $ 202,461 | $ 1.20 /MMBtu |
TOTAL ENERGY |
296,160 MMBtu | $ 740,314 | $ 2.50 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
567,421 kWh 389,845 kWh |
$ 16,294 $ 11,195 |
4.70 % 3.23 % |
$ 0.028 /kWh |
- Demand Charge |
1,902 kW 619 kW |
$ 16,274 $ 5,200 |
8.50 % 2.72 % |
$ 0.69 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 1.20 /MMBtu |
TOTAL ENERGY |
5,816 MMBtu 3,996 MMBtu |
$ 32,568 $ 16,395 |
4.40 % 2.21 % |
$ 2.50 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 5,820 | $ 3,833 | 1.52 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 0 | $ 5,032 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 32,302 | $ 13,718 | 2.35 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 1,500 | $ 1,467 | 1.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE SYNTHETIC LUBRICANT | 2.4314 | N | $ 400 | $ 4,235 | 0.09 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 400 | $ 790 | 0.51 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | 2.7121 | I | $ 0 | $ 2,677 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 406 | $ 816 | 0.50 | ||||||||||||||||
|
|||||||||||||||||||||||