| Assessment Year | 2003 |
|---|---|
| SIC | 3087 |
| SIC Description | Custom Compound Purchased Resins |
| NAICS | 325211 |
| NAICS Description | Plastics Material and Resin Manufacturing |
| Principal Product | Plastic Resins |
| Sales | $ 3,000,000 |
| # of Employees | 13 |
| Plant Area (Sq.Ft.) | 52,000 |
| Annual Production | 7,000,000 Pounds |
| Production Hrs. Annual | 2,470 |
| Location (State) | MI |
| Yearly Energy Cost | $ 120,144 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,319,089 kWh | $ 107,011 | $ 0.081 /kWh |
- Electricity Fees |
- | $ 168 | - |
Natural Gas |
2,315 MMBtu | $ 12,965 | $ 5.60 /MMBtu |
TOTAL ENERGY |
15,836 MMBtu | $ 120,144 | $ 7.59 /MMBtu |
Water Disposal |
40,635 Gal | $ 7,000 | $ 0 /Gal |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-1,080,888 kWh 0 kWh |
$ -87,739 $ 0 |
-81.99 % 0.00 % |
$ 0.081 /kWh |
- Electricity Fees |
- |
$ 26,499 $ 0 |
15,773.21 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 5.60 /MMBtu |
TOTAL ENERGY |
-11,079 MMBtu 0 MMBtu |
$ -61,240 $ 0 |
-50.97 % 0.00 % |
$ 7.59 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ADOPT IN-HOUSE MATERIAL GENERATION | 4.2120 | N | $ 30,000 | $ 101,745 | 0.29 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
SIZE TRUCKS TO JOB | 2.8222 | I | $ 54,000 | $ 76,800 | 0.70 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE | 2.4131 | N | $ 2,477 | $ 582 | 4.26 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | 2.3134 | N | $ 51,860 | $ 26,499 | 1.96 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 521 | $ 2,023 | 0.26 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 13,221 | $ 3,934 | 3.36 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||