Industrial Assessment Centers
Assessment #UL0202
| Assessment Year | 1998 |
|---|---|
| SIC | 3111 |
| SIC Description | Leather Tanning And Finishing |
| NAICS | |
| NAICS Description | |
| Principal Product | Reconstituted Leather Products |
| Sales | $ 12,000,000 |
| # of Employees | 95 |
| Plant Area (Sq.Ft.) | 130,000 |
| Annual Production | 17,000,000 Pounds |
| Production Hrs. Annual | 5,664 |
| Location (State) | IN |
| Yearly Energy Cost | $ 637,163 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
9,885,991 kWh | $ 166,264 | $ 0.017 /kWh |
- Demand Charge |
2,672 kW | $ 293,049 | $ 109.67 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
51,549 MMBtu | $ 177,850 | $ 3.45 /MMBtu |
TOTAL ENERGY |
152,880 MMBtu | $ 637,163 | $ 4.17 /MMBtu |
Water Disposal |
94,772,400 Gal | $ 114,300 | $ 0 /Gal |
Other Liquid (non-haz) |
4,500 Gal | $ 3,000 | $ 0 /Gal |
Solid Waste (non-haz) |
322 lbs | $ 64,400 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
67,702 kWh 0 kWh |
$ 1,139 $ 0 |
0.69 % 0.00 % |
$ 0.017 /kWh |
- Demand Charge |
52 kW 0 kW |
$ 563 $ 0 |
0.19 % 0.00 % |
$ 109.67 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 3.45 /MMBtu |
TOTAL ENERGY |
694 MMBtu 0 MMBtu |
$ 1,702 $ 0 |
0.27 % 0.00 % |
$ 4.17 /MMBtu |
Water Disposal |
85,500,000 Gal 0 Gal |
$ 98,600 $ 0 |
86.26 % 0.00 % |
$ 0 /Gal |
Other Liquid (non-haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
270,000 lbs 0 lbs |
$ 45,400 $ 0 |
70.50 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 7,000 | $ 4,000 | 1.75 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | N | $ 200 | $ 731 | 0.27 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 131 | $ 971 | 0.13 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | 3.4112 | N | $ 380,000 | $ 98,600 | 3.85 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE PLASTIC PALLETS INSTEAD OF WOOD | 3.1163 | N | $ 65,000 | $ 45,400 | 1.43 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST | 4.1310 | N | $ 70,000 | $ 39,940 | 1.75 | ||||||||||||||||
|
|||||||||||||||||||||||