Industrial Assessment Centers
Assessment #UL0190
| Assessment Year | 1997 |
|---|---|
| SIC | 2521 |
| SIC Description | Wood Office Furniture |
| NAICS | |
| NAICS Description | |
| Principal Product | Office Furniture |
| Sales | $ 11,000,000 |
| # of Employees | 90 |
| Plant Area (Sq.Ft.) | 126,067 |
| Annual Production | 52,000 Pieces |
| Production Hrs. Annual | 1,920 |
| Location (State) | IN |
| Yearly Energy Cost | $ 63,079 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,066,823 kWh | $ 63,079 | $ 0.059 /kWh |
- Electricity Fees |
- | $ 0 | - |
TOTAL ENERGY |
10,935 MMBtu | $ 63,079 | $ 5.77 /MMBtu |
Solid Waste (non-haz) |
40,180 lbs | $ 695 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
71,219 kWh 1,758 kWh |
$ 4,224 $ 104 |
6.70 % 0.16 % |
$ 0.059 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
TOTAL ENERGY |
730 MMBtu 18 MMBtu |
$ 4,224 $ 104 |
6.70 % 0.16 % |
$ 5.77 /MMBtu |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 230 $ 0 |
33.09 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 3,425 | $ 104 | 32.93 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 30 | $ 2,848 | 0.01 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 238 | $ 331 | 0.72 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 20 | $ 941 | 0.02 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | 4.4310 | I | $ 3,600 | $ 5,000 | 0.72 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | 3.6192 | N | $ 0 | $ 230 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | 4.5140 | N | $ 17,758 | $ 22,000 | 0.81 | ||||||||||||
|
|||||||||||||||||||