Industrial Assessment Centers
Assessment #UF0451
| Assessment Year | 2011 |
|---|---|
| SIC | 2899 |
| SIC Description | Chemical Preparations, Nec |
| NAICS | 325998 |
| NAICS Description | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| Principal Product | ammunition and pyrotechnics |
| Sales | $ 50,000,000 |
| # of Employees | 280 |
| Plant Area (Sq.Ft.) | 100,000 |
| Annual Production | 500,000 Pieces |
| Production Hrs. Annual | 2,800 |
| Location (State) | FL |
| Yearly Energy Cost | $ 546,204 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,102,800 kWh | $ 342,863 | $ 0.084 /kWh |
- Demand Charge |
9,537 kW | $ 66,769 | $ 7.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
76,683 MMBtu | $ 136,572 | $ 1.78 /MMBtu |
TOTAL ENERGY |
118,737 MMBtu | $ 546,204 | $ 4.60 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
227,455 kWh 174,054 kWh |
$ 19,523 $ 14,815 |
5.69 % 4.32 % |
$ 0.084 /kWh |
- Demand Charge |
225 kW 209 kW |
$ 1,628 $ 1,512 |
2.44 % 2.26 % |
$ 7.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
774 MMBtu 0 MMBtu |
$ 1,379 $ 0 |
1.01 % 0.00 % |
$ 1.78 /MMBtu |
TOTAL ENERGY |
3,105 MMBtu 1,784 MMBtu |
$ 22,530 $ 16,327 |
4.12 % 2.99 % |
$ 4.60 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 0 | $ 5,739 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
INSTALL COMMON HEADER ON COMPRESSORS | 2.4225 | I | $ 222 | $ 8,773 | 0.03 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 3,497 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,277 | $ 1,153 | 1.11 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 3,310 | $ 3,440 | 0.96 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | 2.7124 | I | $ 0 | $ 498 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | 2.2521 | N | $ 1,140 | $ 1,379 | 0.83 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
USE OPTIMUM THICKNESS INSULATION | 2.2515 | N | $ 1,865 | $ 1,327 | 1.41 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||