Assessment #UF0445
| Assessment Year | 2011 |
|---|---|
| SIC | 2899 |
| SIC Description | Chemical Preparations, Nec |
| NAICS | 325998 |
| NAICS Description | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| Principal Product | citrus oil |
| Sales | $ 20,000,000 |
| # of Employees | 40 |
| Plant Area (Sq.Ft.) | 40,000 |
| Annual Production | 20,000,000 Pounds |
| Production Hrs. Annual | 8,760 |
| Location (State) | FL |
| Yearly Energy Cost | $ 379,112 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,666,240 kWh | $ 121,959 | $ 0.073 /kWh |
- Demand Charge |
3,587 kW | $ 43,927 | $ 12.25 /kW |
- Electricity Fees |
- | $ 0 | - |
LPG |
11,113 MMBtu | $ 213,226 | $ 19.19 /MMBtu |
TOTAL ENERGY |
28,192 MMBtu | $ 379,112 | $ 13.45 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
596,285 kWh 519,895 kWh |
$ 53,879 $ 47,579 |
44.18 % 39.01 % |
$ 0.073 /kWh |
- Demand Charge |
410 kW 209 kW |
$ 5,033 $ 2,561 |
11.46 % 5.83 % |
$ 12.25 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
2,273 MMBtu 0 MMBtu |
$ 43,678 $ 0 |
20.48 % 0.00 % |
$ 19.19 /MMBtu |
TOTAL ENERGY |
8,385 MMBtu 5,329 MMBtu |
$ 102,590 $ 50,139 |
27.06 % 13.23 % |
$ 13.45 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 4,542 | $ 13,864 | 0.33 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | 2.7121 | N | $ 9,823 | $ 5,543 | 1.77 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | 2.4324 | N | $ 939 | $ 1,693 | 0.55 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | 2.2622 | I | $ 75,000 | $ 25,323 | 2.96 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 2,580 | $ 43,678 | 0.06 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | 2.4323 | I | $ 2,580 | $ 2,582 | 1.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | 2.4113 | N | $ 1,378 | $ 802 | 1.72 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | N | $ 1,280 | $ 735 | 1.74 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 8,778 | $ 8,370 | 1.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | 2.1336 | N | $ 150,000 | $ 118,931 | 1.26 | ||||||||||||||||
|
|||||||||||||||||||||||