| Assessment Year | 2010 |
|---|---|
| SIC | 3694 |
| SIC Description | Engine Electrical Equipment |
| NAICS | 336413 |
| NAICS Description | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| Principal Product | aircraft ignition exciters |
| Sales | $ 6,000,000 |
| # of Employees | 600 |
| Plant Area (Sq.Ft.) | 150,000 |
| Annual Production | 10,000 Not Available |
| Production Hrs. Annual | 4,860 |
| Location (State) | FL |
| Yearly Energy Cost | $ 1,087,157 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,854,933 kWh | $ 861,099 | $ 0.110 /kWh |
- Demand Charge |
17,766 kW | $ 160,799 | $ 9.05 /kW |
- Electricity Fees |
- | $ 65,259 | - |
TOTAL ENERGY |
80,514 MMBtu | $ 1,087,157 | $ 13.50 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
484,694 kWh 456,718 kWh |
$ 49,150 $ 46,408 |
5.71 % 5.39 % |
$ 0.110 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 9.05 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
TOTAL ENERGY |
95,124 MMBtu 4,681 MMBtu |
$ 135,699 $ 46,408 |
12.48 % 4.27 % |
$ 13.50 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | I | $ 5,655 | $ 28,959 | 0.20 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | I | $ 0 | $ 1,044 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 1,531 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | 2.7124 | I | $ 0 | $ 2,547 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 0 | $ 1,211 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | 2.2441 | N | $ 4,000 | $ 86,549 | 0.05 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 404 | $ 7,016 | 0.06 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | 2.7228 | I | $ 0 | $ 6,842 | 0.00 | ||||||||||||
|
|||||||||||||||||||