Assessment #UF0424
| Assessment Year | 2009 |
|---|---|
| SIC | 2421 |
| SIC Description | Sawmills And Planing Mills, General |
| NAICS | 321113 |
| NAICS Description | Sawmills |
| Principal Product | Dimensioned Lumber |
| Sales | $ 50,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 177,000 |
| Annual Production | 180,000,000 Not Available |
| Production Hrs. Annual | 2,704 |
| Location (State) | FL |
| Yearly Energy Cost | $ 989,444 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
11,797,340 kWh | $ 867,717 | $ 0.074 /kWh |
- Electricity Fees |
- | $ 0 | - |
Fuel Oil #1 |
4,140 MMBtu | $ 121,727 | $ 29.40 /MMBtu |
TOTAL ENERGY |
125,063 MMBtu | $ 989,444 | $ 7.91 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,415,547 kWh 0 kWh |
$ 104,748 $ 0 |
12.07 % 0.00 % |
$ 0.074 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #1 |
559 MMBtu 0 MMBtu |
$ 13,923 $ 0 |
11.44 % 0.00 % |
$ 29.40 /MMBtu |
TOTAL ENERGY |
15,068 MMBtu 0 MMBtu |
$ 118,671 $ 0 |
11.99 % 0.00 % |
$ 7.91 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 28,843 | $ 53,117 | 0.54 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 562 | $ 151 | 3.72 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | 2.7121 | N | $ 397 | $ 11,733 | 0.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 425 | $ 2,063 | 0.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 24,740 | $ 31,025 | 0.80 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REDUCE HEAT GAIN BY WINDOW TINTING | 2.7423 | N | $ 800 | $ 790 | 1.01 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | 3.5313 | N | $ 2,500 | $ 512 | 4.88 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | 2.1131 | N | $ 512 | $ 1,080 | 0.47 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 564 | $ 1,732 | 0.33 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 300 | $ 9,752 | 0.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 2,525 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 6,884 | $ 6,440 | 1.07 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 12,272 | $ 14,512 | 0.85 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 14 | view details |
ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | 2.8227 | N | $ 0 | $ 13,923 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 15 | view details |
KEEP EQUIPMENT CLEAN | 2.6125 | N | $ 816 | $ 1,885 | 0.43 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||