Industrial Assessment Centers
Assessment #UF0423
| Assessment Year | 2009 |
|---|---|
| SIC | 5162 |
| SIC Description | Plastics Materials & Basic Shapes |
| NAICS | 324110 |
| NAICS Description | Petroleum Refineries |
| Principal Product | thermoplastic elastomer pellets |
| Sales | $ 27,000,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 152,919 |
| Annual Production | 1,200,000,000 Pounds |
| Production Hrs. Annual | 8,760 |
| Location (State) | FL |
| Yearly Energy Cost | $ 3,107,473 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
39,299,809 kWh | $ 3,107,473 | $ 0.079 /kWh |
- Electricity Fees |
- | $ 0 | - |
TOTAL ENERGY |
402,823 MMBtu | $ 3,107,473 | $ 7.71 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
5,634,902 kWh 267,503 kWh |
$ 490,547 $ 21,422 |
15.79 % 0.69 % |
$ 0.079 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
TOTAL ENERGY |
57,757 MMBtu 2,742 MMBtu |
$ 490,547 $ 21,422 |
15.79 % 0.69 % |
$ 7.71 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 12,571 | $ 7,135 | 1.76 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
USE OPTIMUM TEMPERATURE | 2.2211 | N | $ 0 | $ 45,100 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 600 | $ 1,442 | 0.42 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 38,839 | $ 31,606 | 1.23 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
REDESIGN PROCESS | 2.5194 | N | $ 300,000 | $ 206,074 | 1.46 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | I | $ 0 | $ 753 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 2,503 | $ 5,505 | 0.45 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 315 | $ 495 | 0.64 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
RECYCLE FLUORESCENT LAMPS | 3.5318 | N | $ 3,405 | $ 2,671 | 1.27 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | 2.7141 | N | $ 283 | $ 1,109 | 0.26 | ||||||||||||
|
|||||||||||||||||||
| 11 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,301 | $ 15,767 | 0.08 | ||||||||||||
|
|||||||||||||||||||
| 12 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 5,591 | $ 159,410 | 0.04 | ||||||||||||
|
|||||||||||||||||||
| 13 | view details |
LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | 3.5315 | N | $ 0 | $ 7,000 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 14 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 0 | $ 3,460 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 15 | view details |
General | 3.521 | N | $ 1,164 | $ 8,403 | 0.14 | ||||||||||||
|
|||||||||||||||||||
| 16 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 506 | $ 4,288 | 0.12 | ||||||||||||
|
|||||||||||||||||||
| 17 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 24,901 | $ 68,520 | 0.36 | ||||||||||||
|
|||||||||||||||||||
