Industrial Assessment Centers
Assessment #UF0419
| Assessment Year | 2009 |
|---|---|
| SIC | 3851 |
| SIC Description | Ophthalmic Goods |
| NAICS | 339112 |
| NAICS Description | Surgical and Medical Instrument Manufacturing |
| Principal Product | pharmaceuticals |
| Sales | $ 150,000,000 |
| # of Employees | 400 |
| Plant Area (Sq.Ft.) | 130,000 |
| Annual Production | 40,000,000 Pieces |
| Production Hrs. Annual | 6,300 |
| Location (State) | FL |
| Yearly Energy Cost | $ 1,948,145 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
16,982,280 kWh | $ 1,550,749 | $ 0.091 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
36,441 MMBtu | $ 397,396 | $ 10.91 /MMBtu |
TOTAL ENERGY |
210,509 MMBtu | $ 1,948,145 | $ 9.25 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,408,021 kWh 0 kWh |
$ 225,470 $ 0 |
14.54 % 0.00 % |
$ 0.091 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
487,118 MMBtu 0 MMBtu |
$ 112,051 $ 0 |
28.20 % 0.00 % |
$ 10.91 /MMBtu |
TOTAL ENERGY |
511,799 MMBtu 0 MMBtu |
$ 337,521 $ 0 |
17.33 % 0.00 % |
$ 9.25 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 904 | $ 36,890 | 0.02 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 0 | $ 2,358 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 1,291 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 0 | $ 490 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 3,405 | $ 2,671 | 1.27 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 9,325 | $ 32,995 | 0.28 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 1,026 | $ 112,051 | 0.01 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | 2.7425 | N | $ 42,500 | $ 107,292 | 0.40 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | 2.2441 | N | $ 4,000 | $ 41,483 | 0.10 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | 3.1293 | N | $ 3,405 | $ 2,671 | 1.27 | ||||||||||||
|
|||||||||||||||||||