Assessment #UF0406
| Assessment Year | 2007 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312112 |
| NAICS Description | Bottled Water Manufacturing |
| Principal Product | bottled water |
| Sales | $ 121,000,000 |
| # of Employees | 330 |
| Plant Area (Sq.Ft.) | 425,000 |
| Annual Production | 1,030,000,000 Pieces |
| Production Hrs. Annual | 8,736 |
| Location (State) | FL |
| Yearly Energy Cost | $ 4,453,321 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
45,302,051 kWh | $ 3,962,005 | $ 0.087 /kWh |
- Demand Charge |
177,655 kW | $ 348,787 | $ 1.96 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
130,310 MMBtu | $ 142,529 | $ 1.09 /MMBtu |
TOTAL ENERGY |
594,656 MMBtu | $ 4,453,321 | $ 7.49 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,963,493 kWh 2,605,429 kWh |
$ 280,714 $ 247,516 |
7.09 % 6.25 % |
$ 0.087 /kWh |
- Demand Charge |
2 kW 0 kW |
$ 42 $ 0 |
0.01 % 0.00 % |
$ 1.96 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,907 MMBtu 2,288 MMBtu |
$ 31,695 $ 24,941 |
22.24 % 17.50 % |
$ 1.09 /MMBtu |
TOTAL ENERGY |
33,282 MMBtu 28,993 MMBtu |
$ 312,451 $ 272,457 |
7.02 % 6.12 % |
$ 7.49 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | 2.7141 | N | $ 253 | $ 1,441 | 0.18 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | 2.7121 | N | $ 289 | $ 372 | 0.78 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL SET-BACK TIMERS | 2.6232 | N | $ 625 | $ 6,690 | 0.09 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | 2.5195 | N | $ 399 | $ 6,004 | 0.07 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 619 | $ 17,857 | 0.03 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 714 | $ 17,557 | 0.04 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 229,959 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
PREHEAT COMBUSTION AIR WITH WASTE HEAT | 2.2442 | N | $ 22,000 | $ 6,754 | 3.26 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INCREASE INSULATION THICKNESS | 2.2512 | I | $ 1,380 | $ 7,084 | 0.19 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 6,479 | $ 18,733 | 0.35 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
INSTALL AN UNINTERUPTABLE POWER SUPPLY | 4.6310 | N | $ 5,831 | $ 4,744,561 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||