Industrial Assessment Centers
Assessment #UF0399
| Assessment Year | 2007 |
|---|---|
| SIC | 3841 |
| SIC Description | Surgical And Medical Instruments |
| NAICS | 333298 |
| NAICS Description | All Other Industrial Machinery Manufacturing |
| Principal Product | Filters |
| Sales | $ 25,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 105,000 |
| Annual Production | 40,000,000 Pieces |
| Production Hrs. Annual | 8,400 |
| Location (State) | FL |
| Yearly Energy Cost | $ 1,523,071 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
14,466,032 kWh | $ 632,720 | $ 0.044 /kWh |
- Demand Charge |
30,036 kW | $ 245,030 | $ 8.16 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
54,747 MMBtu | $ 645,321 | $ 11.79 /MMBtu |
TOTAL ENERGY |
203,024 MMBtu | $ 1,523,071 | $ 7.50 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
684,982 kWh 263,108 kWh |
$ 35,987 $ 14,491 |
5.69 % 2.29 % |
$ 0.044 /kWh |
- Demand Charge |
56 kW 0 kW |
$ 5,493 $ 0 |
2.24 % 0.00 % |
$ 8.16 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,105 MMBtu 0 MMBtu |
$ 48,434 $ 0 |
7.51 % 0.00 % |
$ 11.79 /MMBtu |
TOTAL ENERGY |
11,125 MMBtu 2,696 MMBtu |
$ 89,914 $ 14,491 |
5.90 % 0.95 % |
$ 7.50 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 24,800 | $ 3,373 | 7.35 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | 2.2531 | N | $ 1,376 | $ 349 | 3.94 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 437 | $ 3,878 | 0.11 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 8,852 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
INCREASE INSULATION THICKNESS | 2.2512 | N | $ 188 | $ 1,157 | 0.16 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 0 | $ 939 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 44,692 | $ 20,311 | 2.20 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 35,000 | $ 47,277 | 0.74 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 1,719 | $ 2,017 | 0.85 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 404 | $ 1,761 | 0.23 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
RECYCLE FLUORESCENT LAMPS | 3.5318 | I | $ 3,486 | $ 1,005 | 3.47 | ||||||||||||||||
|
|||||||||||||||||||||||
| 12 | view details |
CHANGE OPERATING CONDITIONS | 4.6320 | I | $ 731 | $ 74,852 | 0.01 | ||||||||||||||||
|
|||||||||||||||||||||||