Assessment #UD0839
| Assessment Year | 2011 |
|---|---|
| SIC | 2032 |
| SIC Description | Canned Specialties |
| NAICS | 311422 |
| NAICS Description | Specialty Canning |
| Principal Product | Packaged Food |
| Sales | $ 175,000,000 |
| # of Employees | 365 |
| Plant Area (Sq.Ft.) | 182,000 |
| Annual Production | 125,000,000 Pieces |
| Production Hrs. Annual | 6,000 |
| Location (State) | OH |
| Yearly Energy Cost | $ 1,572,831 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
12,255,959 kWh | $ 837,216 | $ 0.068 /kWh |
- Demand Charge |
24,611 kW | $ 118,893 | $ 4.83 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
96,888 MMBtu | $ 616,722 | $ 6.37 /MMBtu |
TOTAL ENERGY |
222,513 MMBtu | $ 1,572,831 | $ 7.07 /MMBtu |
Water Disposal |
213,915,284 Gal | $ 991,312 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
719,317 kWh 593,608 kWh |
$ 44,700 $ 36,803 |
5.34 % 4.40 % |
$ 0.068 /kWh |
- Demand Charge |
736 kW 448 kW |
$ 3,231 $ 1,988 |
2.72 % 1.67 % |
$ 4.83 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
19,044 MMBtu 5,209 MMBtu |
$ 121,613 $ 33,486 |
19.72 % 5.43 % |
$ 6.37 /MMBtu |
TOTAL ENERGY |
26,417 MMBtu 11,294 MMBtu |
$ 169,544 $ 72,277 |
10.78 % 4.60 % |
$ 7.07 /MMBtu |
Water Disposal |
8,212,292 Gal 8,212,292 Gal |
$ 38,098 $ 38,098 |
3.84 % 3.84 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 5,668 | $ 4,985 | 1.14 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 02 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 1,875 | $ 1,620 | 1.16 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 500 | $ 58,395 | 0.01 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 20,472 | 0.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 05 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 5,000 | $ 7,623 | 0.66 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 06 | view details |
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | 2.2441 | N | $ 90,000 | $ 80,401 | 1.12 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 07 | view details |
USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | 2.2128 | N | $ 59,764 | $ 29,882 | 2.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 08 | view details |
REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | 2.1221 | N | $ 90,000 | $ 80,401 | 1.12 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 09 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 3,000 | $ 14,418 | 0.21 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 10 | view details |
OPERATE BOILERS ON HIGH FIRE SETTING | 2.1212 | I | $ 23,620 | $ 11,810 | 2.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 11 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 2,100 | $ 5,425 | 0.39 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 12 | view details |
INSTALL / REPAIR INSULATION ON CONDENSATE LINES | 2.2122 | I | $ 993 | $ 1,987 | 0.50 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 13 | view details |
USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | 3.4111 | I | $ 75,000 | $ 48,911 | 1.53 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 14 | view details |
INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | 2.7235 | N | $ 25 | $ 3,732 | 0.01 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||