Industrial Assessment Centers
Assessment #UD0821
| Assessment Year | 2010 |
|---|---|
| SIC | 3841 |
| SIC Description | Surgical And Medical Instruments |
| NAICS | 339112 |
| NAICS Description | Surgical and Medical Instrument Manufacturing |
| Principal Product | Medical Surgical Tools |
| Sales | $ 25,000,000 |
| # of Employees | 561 |
| Plant Area (Sq.Ft.) | 69,250 |
| Annual Production | 15,989,823 Not Available |
| Production Hrs. Annual | 6,600 |
| Location (State) | OH |
| Yearly Energy Cost | $ 1,028,834 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
15,250,715 kWh | $ 1,002,899 | $ 0.066 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
2,128 MMBtu | $ 25,935 | $ 12.19 /MMBtu |
TOTAL ENERGY |
158,448 MMBtu | $ 1,028,834 | $ 6.49 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,381,710 kWh 1,291,290 kWh |
$ 53,875 $ 50,518 |
5.37 % 5.04 % |
$ 0.066 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
634 MMBtu 121 MMBtu |
$ 7,727 $ 1,475 |
29.79 % 5.69 % |
$ 12.19 /MMBtu |
TOTAL ENERGY |
14,795 MMBtu 13,356 MMBtu |
$ 84,442 $ 72,093 |
8.21 % 7.01 % |
$ 6.49 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE SOLAR HEAT TO MAKE ELECTRICTY | 2.9114 | I | $ 300,000 | $ 4,575 | 65.57 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 25 | $ 3,610 | 0.01 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 75 | $ 3,331 | 0.02 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 60,300 | $ 40,341 | 1.49 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 893 | $ 479 | 1.86 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 4,000 | $ 3,023 | 1.32 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 25 | $ 2,766 | 0.01 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | 2.7232 | I | $ 43,700 | $ 23,979 | 1.82 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | 2.7235 | N | $ 5,542 | $ 2,560 | 2.16 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 3,500 | $ 1,772 | 1.98 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | 2.7241 | N | $ 400 | $ 669 | 0.60 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||