Industrial Assessment Centers
Assessment #UD0805
| Assessment Year | 2009 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312111 |
| NAICS Description | Soft Drink Manufacturing |
| Principal Product | Carbonated Soft Drinks |
| Sales | $ 261,000,000 |
| # of Employees | 500 |
| Plant Area (Sq.Ft.) | 233,000 |
| Annual Production | 22,000,000 Pieces |
| Production Hrs. Annual | 6,864 |
| Location (State) | OH |
| Yearly Energy Cost | $ 781,038 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,280,600 kWh | $ 439,086 | $ 0.083 /kWh |
- Demand Charge |
1,298 kW | $ 0 | $ 0.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
34,389 MMBtu | $ 341,952 | $ 9.94 /MMBtu |
TOTAL ENERGY |
88,515 MMBtu | $ 781,038 | $ 8.82 /MMBtu |
Water Disposal |
24,596 Gal | $ 109,262 | $ 4 /Gal |
Solid Waste (non-haz) |
251,373 lbs | $ 217,702 | $ 1 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,457,560 kWh 944,514 kWh |
$ 49,558 $ 32,114 |
11.29 % 7.31 % |
$ 0.083 /kWh |
- Demand Charge |
228 kW 117 kW |
$ 42,558 $ 20,980 |
0.00 % 0.00 % |
$ 0.00 /kW |
- Electricity Fees |
- |
$ 27,413 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
3,164 MMBtu 983 MMBtu |
$ 31,459 $ 9,775 |
9.20 % 2.86 % |
$ 9.94 /MMBtu |
TOTAL ENERGY |
18,105 MMBtu 10,665 MMBtu |
$ 150,988 $ 62,869 |
19.33 % 8.05 % |
$ 8.82 /MMBtu |
Water Disposal |
238,612 Gal 0 Gal |
$ 1,423 $ 0 |
1.30 % 0.00 % |
$ 4 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 1 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | N | $ 12,000 | $ 39,022 | 0.31 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 25,000 | $ 21,769 | 1.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 17,147 | $ 16,619 | 1.03 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 25,117 | $ 11,872 | 2.12 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
RECOVER HEAT FROM REFRIGERATION CONDENSERS | 2.2436 | N | $ 2,000 | $ 10,974 | 0.18 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 16,000 | $ 10,710 | 1.49 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 8,043 | $ 8,327 | 0.97 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 6,703 | $ 6,938 | 0.97 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
REDUCE EXCESSIVE BOILER BLOWDOWN | 2.1241 | I | $ 5,000 | $ 5,312 | 0.94 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 0 | $ 4,119 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 4,283 | $ 3,797 | 1.13 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
CHECK FOR ACCURACY OF UTILITY METERS | 2.8111 | N | $ 0 | $ 3,741 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 13 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 0 | $ 3,689 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 14 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | I | $ 0 | $ 2,965 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 15 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 5,000 | $ 1,903 | 2.63 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 16 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,000 | $ 1,428 | 0.70 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 17 | view details |
METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | 3.4116 | N | $ 0 | $ 1,423 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 18 | view details |
ISOLATE HOT OR COLD EQUIPMENT | 2.2522 | I | $ 0 | $ 666 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||